• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 559
  • 177
  • 110
  • 18
  • 3
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 861
  • 348
  • 295
  • 162
  • 138
  • 114
  • 105
  • 101
  • 94
  • 92
  • 82
  • 76
  • 75
  • 59
  • 59
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
571

Implementering och användning av digitala verktyg med fokus på nyttjande av 3D-modell i produktion / Implementation and usage of digital tools with focus on utilization of 3D models in production

Mohammed, Lina, Al Rifai, Rama January 2023 (has links)
Digitaliseringen inom byggbranschen har inte kommit långt i dess utveckling i jämförelse med andra branscher, men det finns en ökande insikt om att ökad digitalisering kan leda till betydande effektiviseringar. I detta arbete har fokus legat på att undersöka användningen av digitala verktyg, särskilt 3D-modellen, i produktionsskedet. Detta beror på att utvecklingen inom produktionen har varit relativt långsam jämfört med andra skeden. För närvarande används digitala verktyg och 3D-modellen främst i projekterings- och förvaltningsprocessen för att bland annat skapa digitala modeller, samordna olika discipliner och fungera som beräkningsverktyg. Trots framstegen kvarstår frågan om hur dessa verktyg, särskilt 3D-modellen, bör tillämpas och användas i produktionsskedet på ett mer omfattande sätt. Därför är målet med denna rapport att föreslå hur arbetssättet kan utvecklas inom produktionen för att öka användningen av 3Dmodellen och uppnå en mer effektiv arbetsprocess inom entreprenadföretag. Genom att utforska och identifiera de potentiella fördelarna med att använda 3D-modellen i produktionsskedet kan vi identifiera områden där den kan integreras på ett mer meningsfullt sätt. Rapporten undersöker eventuella hinder och brister i 3D-modellen som kan förhindra en bredare användning i produktionen. Genom att identifiera dessa kan det föreslås åtgärder och strategier för att övervinna dem och främja en mer omfattande användning av digitala verktyg samt 3D-modell i byggproduktionen. Metoden som har använts under studiens gång för att undersöka detta är både kvalitativ, som innefattar intervjuer, och kvantitativ i form av litteraturstudier. Intervjuerna genomfördes på fem arbetsledare som är verksamma på olika projekt på ett och samma större entreprenadföretag i Malmö. Litteraturstudier användes för att komplettera förståelsen och dra nytta av tidigare forskning. En viktig avgränsning i arbetet är att samtliga projekt är ungefär densamma i omfattning och storlek, detta för att bidra till ett mer tillförlitligt och jämförbart resultat. Resultatet av intervjuerna visar att arbetsledare nyttjar tillgång till digitala verktyg och 3Dmodell i produktion idag, dock till en begränsad omfattning. Det finns resurser för att använda sig av dem, men det finns inte en tydlig arbetsmetodik för det. Det finns dessutom diverse brister i 3D-modellen som gör det mindre tillförlitligt samt ökar svårigheten med att använda modellen. I det fallet faller arbetsledare och resterande arbetare tillbaka till att använda ritningar som komplement. Studiens slutsats är att det ligger en stor vikt vid att ha en tydlig presenterad arbetsmetod i början av ett projekt. Entreprenadföretagen bör ta fram arbetssätt som upplyser, demonstrerar samt utbildar samtliga arbetsledare om vilka funktioner 3D-modellen har, hur den kan effektivisera det vardagliga arbetet samt hur den kan nyttjas. Detta skulle bidra till mer motivation hos samtliga i produktionen samt ökad användning av de digitala verktygen. Dessutom påvisar studien vikten av en kontinuerligt uppdaterad 3D-modell samt ökad detaljhantering redan från projekteringen, som förutsättning för ökad användning av 3D-modell i produktion. / The digitalization of the construction industry has not advanced significantly compared to other industries, but there is a growing recognition that increased digitalization can lead to significant efficiency improvements. This study focuses on investigating the use of digital tools, particularly the 3D model, in the production phase. Therefore, the goal of this report is to propose ways to develop the workflow in production to increase the use of the 3D model and achieve a more efficient work process within construction companies. By exploring and identifying the potential benefits of using the 3D model in the production phase. The methodology employed in this study encompasses both qualitative aspects, such as interviews, and quantitative elements, through literature reviews. The interviews were conducted with five construction supervisors involved in different projects within a major construction company in Malmö. The interview findings indicate that construction supervisors currently utilize digital tools and the 3D model in production to a limited extent. While resources are available for their use, there is a lack of clear methodologies. Other challenges highlighted in the report include various deficiencies in the 3D model, which make it less reliable and increase the difficulty of its utilization. The study concludes that a significant emphasis should be placed on establishing a clearly presented workflow at the beginning of a project. Construction companies should develop approaches that inform, demonstrate, and educate all construction supervisors about the functionalities of the 3D model, how it can streamline daily work, and how it can be utilized. Furthermore, the study highlights the importance of maintaining an updated 3D model throughout the project and enhancing detail management from the design phase as a prerequisite for increased usage of the 3D model in production.
572

Paradigms of Music Software Development

Möllenkamp, Andreas 13 September 2022 (has links)
On the way to a more comprehensive and integrative historiography of music software, this paper proposes a survey of the main paradigms of music software development from the 1950s to the present. Concentrating on applications for music composition, production and performance, the analysis focusses on the concept and design of the human-computer-interaction as well as the implicit user.
573

Kvalitetssäkring inom byggbranschen : Entreprenörens egenkontroll i produktion / Quality within the construction industry : The entrepreneur’s self-inspection in production

Carlsson Sandelin, Emma, Mattsson, Maja January 2019 (has links)
Egenkontroll utgör en viktig del av byggbranschens kvalitetsarbete och något som under lång tid diskuterats som en lösning på byggbranschens kvalitetsproblem. Studier har dock riktat kritik till hur byggbranschens egenkontroll utförs och dokumenteras och pekar på att dess trovärdighet länge har varit låg. Det har även poängterats att det finns stora brister i både engagemang och kunskap kring egenkontrollens syfte och utförande. I och med den fjärde industriella revolutionen och dess snabba digitala utveckling har digitala verktyg implementerats för att underlätta utförande och dokumentation av egenkontrollen. Frågan är dock om digitala verktyg är rätt väg att gå när det gäller att försöka öka egenkontrollens bristande trovärdighet. Detta examensarbete syftar därmed till att skapa en ökad förståelse för egenkontrollens syfte samt ge en sammanställd bild av hur egenkontrollsystemet inom den svenska byggbranschen fungerar i produktion. Detta gäller både egenkontrollsystemet generellt men även med koppling till det digitala verktyg som implementerats för dess utförande och dokumentation. Arbetet har genomförts som en fördjupad litteraturstudie med kompletterande empiristudie där erfarenheter samlats in från både tidigare forskning, studier och deltagande respondenter. Resultatet av studien visar att det finns en stor variation i uppfattningen om egenkontrollens syfte och kravställning samt att det finns en utbredd brist på både kunskap och motivation kring egenkontrollens utförande och dokumentation. Detta har bidragit till en generell brist på tilltro till byggbranschens egenkontrollsystem. Det verktyg som implementerats för digitalt utförande och dokumentation av egenkontroll har påvisat fördelaktiga effekter men har inte lyckats åtgärda den problematik kring de variationer och brister som framkommit i denna rapport. För att åtgärda byggbranschens rådande kvalitetsbrister förespråkas att branschens företag sätter upp tydliga ramar för hur arbetet med egenkontroll ska utföras inom den egna verksamheten samt att detta arbetssätt sedan implementeras på rätt sätt. Att arbetssättet för egenkontroll finns på plats är en förutsättning för implementering av digitala verktyg. / Self-inspection is an important part of the construction industry's quality work and is something that has been discussed as a solution to the quality problems of the construction industry. However, studies have criticized how self-inspection is carried out and documented, also pointing out its low credibility. In addition, it is emphasized that there are major shortcomings in both commitment and knowledge about the purpose and execution of self-inspection. With the fourth industrial revolution and its rapid digital development, digital tools have been implemented to facilitate the execution and documentation of self-inspection. With that being said, the question is whether digital tools are the correct solution to increase the selfinspection’s lack of credibility. Therefore, this master thesis aims to provide readers with an increased understanding of the purpose of self-inspection, as well as to provide a comprehensive picture of how the system of self-inspection within the Swedish construction industry is perceived in production. This applies both to the system of self-inspection in general, as well as the digital tool that are implemented for execution and documentation. The work has been carried out as an in-depth literature study with a complementary empirical study in which experiences have been collected from both previous research, studies and participant respondents. The result of the study shows that there is a great variation in the perception of the purpose and requirements of self-inspection, and that there is a widespread lack of both knowledge and motivation regarding the execution and documentation of self-inspection. This has contributed to a general lack of trust in the self-inspection system. The tool that has been implemented for digital execution and documentation of self-inspection has shown beneficial effects but has not been able to address the problems surrounding the variations and shortcomings that have emerged throughout this report. In order to remedy the prevailing quality deficiencies in the construction industry, it is advocated that companies set up clear frameworks for how the work with self-inspection should be carried out within their own operations and that this work method is then implemented correctly. The means of self-inspection needs to be in place before any implementation of digital tools is advantageously possible.
574

Utveckling av koncept för ny åkprofil till bakgavellyft : Produktutveckling och konstruktion

Fritzon, Gustav January 2022 (has links)
Detta examensarbete har utförts i samarbete med Z-lyften Produktion AB som tillverkar bakgavellyftar till lastbilar. En av deras modeller har funktionen att den kan köras in under lastbilen eller trailern. Lyften rullar då på hjul i så kallad slädprofiler som i sin tur är fästa mot lastbilen med ramfästen. Dessa profiler är i dagsläget tillverkade i stål och dimensionerade efter lasterna i arbetsläget vilket gör att de är överdimensionerade över resten av dess längd. Detta gör dem onödigt tunga. De är också svåra att kapa till olika längder och det finns en önskan att göra ramfästena flyttbara. Syftet med detta arbete blev därför att minska profilens vikt och därmed ge miljö- och arbetsmäss-iga vinster, göra fästena flyttbara för enklare montage på lastbil samt medge enklare kapning för effektivare produktion. Målet var att genom en produktutvecklingsprocess presentera ett koncept i form av en 3D-modell på en ny konstruktion av åkprofilen som uppfyller ovan nämnda syfte. En förstudie gav en överblick av konkurrensen och samtal med intres-senter gav en omfattande produktspecifikation att utgå ifrån i det fortsatta arbetet. Produktens önskade funktioner analyserades och dellösningar till dessa söktes sedan i ett antal källor. Detta ledde fram till en rad lös-ningar som kombinerades till fyra koncept varav ett valdes ut för detaljkonstruktion som utfördes med analytiska och numeriska beräk-ningar. Det slutgiltiga konceptet bestod i en aluminiumprofil med spår för flyttbara fästen och glidlager av plast i stället för hjul. Konceptet gav enligt en uppskattning en viktbesparing på 20% jämfört med den nuvarande och profilen i sig blev 60% lättare. Kostnadsmässigt gav själva profilen en besparing på 13% men totalt riskerar konceptet att bli dyrare än den ursprungliga lösningen då förstärkningar av stål behövs i arbetsläget. / This thesis is written in cooperation with Z-lyften Produktion AB which is a manufacturer of tail lifts for trucks. One of their models works by enabling the operator to stow the tail lift under the truck or trailer. The tail lift is in this case mounted on wheel brackets with steel wheels that rolls inside slide profiles. The slide profiles are mounted to the truck frame. Currently, these profiles are made from steel, and they are dimensioned to withstand the loads that are present when the lift is in operation. Therefore, the slide profiles are excessively dimensioned across the length except where the wheels are positioned during operation which causes them to be unnecessarily heavy. The steel profile is difficult to cut in production and there is also a desire to have mounting brackets that can be positioned more freely on the profile. Regarding this, the purpose of this work was to make the profiles lighter to reduce the environmental impact as well as improve the working environment in the production facility, make the mounting brackets more flexible to make the mounting process easier and to make the cutting process easier. The goal was to provide the company with a concept in the form of a 3D-model that fulfils the above purpose. A feasibility study provided an overview of the competition and meetings with stakeholders gave the comprehensive list of product specifications that was the foundation for the rest of the process. The desired functions of the product were analysed and solutions to the functions was then gathered from several sources. The identified possible solutions were then combined into four concepts of which one concept was selected for further development and dimensioning with analytical and numerical methods. The final concept is based on an extruded aluminium profile with polymer slide bearings and T-shaped slots for the mounting brackets. A rough estimate pointed to a weight saving of about 20% for the concept as a whole and the slide profiles alone was 60% lighter. The new profiles gave a cost reduction of 13% but the concept as a whole runs the risk of becoming more expensive than the current solution. / <p>2022-07-01</p>
575

Påträffande av naturlig arsenik vid produktion och dess påverkan : Nybyggnation av trafikplats Roserberg / Encountering natural arsenic in production and its impact : Construction of the interchange Roserberg

Law, Hai-Kit, Jakobsson, Johan January 2014 (has links)
Vi har i examensarbete sammanställt rapporter, information, material och erfarenhet som Trafikverket har samlat på sig. Vi har i samband med nybyggnationen av trafikplats Rosersberg som mål att kartlägga händelseförloppet vid påträffande av arsenik. Dessa uppgifter kommer från alla de involverade parterna som konsulter, entreprenör, geologer, mm. Även Sigtuna kommuns beslut kring omhändertagandet med avseendet på ”Miljö och Hälsa” kommer att studeras. T. ex Verkaån som ligger i kommunen har en central betydelse. Detta kommer också att bli en stor del utav utredningsarbetet då själva anmälningshantering och beslutsprocessen omfattar en stor del av det kritiska momentet gällande tidsförlängningen av produktion. Syftet här är att reda ut de ansvarsrollernas klargörande och om beslutsprocessen möjligen kan ske på ett effektivare sätt. Även bringa klarhet kring samordningen av vägproduktionen och hur det har samverkats följt av djupare analys kring omhändertagandet av arsenik. Merkostnaden för förekomsten av arsenik uppgick till över 30 mnkr och en stor mängd ändrings- och tilläggsarbeten (ÄTA) utav de sammanlagda kring 200 uppkom som en påföljd. Produktionen förlängdes med nio och en halv månad då behovet utav hantering av grundvattnet, jord- och bergmassor var ett faktum för att produktionen skulle fortgå. Utöver instudering av insamlat material kommer vi att intervjua de inblandade och vi räknar med att få in kompletterande uppgifter som hjälper oss in i utredningen. Detta leder oss vidare i utredningen vilken omfattning förekomsten av arsenik har påverkat produktionen i avseendet tid och kostnad. Problemställningen som vi ämnar söka svar på: • Identifiera förekomsten av naturlig arsenik och dess påverkan vid produktion • Identifiera brister som uppstod innan störning i produktionen uppkom • Minska uppkommen störning i produktion • Korrigera avvikelsen i planerat förlopp och sedan styra in verksamheten mot slutmålet / We have of this thesis compiled reports, information, materials and experience that the Swedish Transport Administration has gathered, associated with the rebuilding of the interchange Rosersberg, we aim to identify the sequence of events in the discovery of arsenic. These data come from all the involved parties such as consultants, contractors, geologists, etc. And also decisions making from Sigtuna municipality, about the care and with respect to "Environment and Health" will be studied. For example Verkaån located in the municipality will be centralized in our work. This will also be a big part out investigation work, then the notification management and decision-making encompasses a big part of the critical moment regarding extension of time of production. The purpose here is to clarify the responsibility, commitment and if it possibly can be done more efficiently. The additional cost for the presence of arsenic was over 30 million SEK and a great amount of alterations and additional work (ÄTA) out of the total of around 200 was ocurred as a penalty. The production was extended for nine and a half months since the need of overall management of groundwater, soil and rock masses had to be taken care of before production would continue. This case study will let us understanding the coordination of road production and how it has been collaborated followed by in-depth analysis about the disposal of arsenic. In addition to studies of the gathered information regarding Rosersberg, we will also be interviewing those involved and expects to obtain additional information that will help us in the investigation. This leads us to the investigation to what extent the presence of arsenic has affected production in respect of time and cost. The following problems that we intend to seek answers to: • Identify the presence of natural arsenic and its impact on production • Identify deficiencies that arose before the disruption in production occurred • Reduce the resulting disruption in production • Correct the error in the planned course and then steer the organization towards its final aim
576

Kartläggning och förbättring av internt logistikflöde / Mapping and improving internal logistic flow

Alhasan, Jenan, Nguyen, Dat January 2023 (has links)
Globalisation has led to increased competition among companies, operating both locally and internationally. As a result, it has become crucial to stand out on the market by working cost-effectively, meeting customer requirements, offering short delivery times, smart material planning, among other things. New conditions, ranging from technological advancements to environmental demands, have prompted companies to focus on improving their material flow. The concept of logistics, along with lean-production, is now being recognized as a powerful tool. The purpose of this thesis is to gain a deeper understanding of wastes in a company's internal logistics flow and provide improvement suggestions for enhancing efficiency. The goal is to provide a foundation for future enhancements in the logistics flow of a manufacturing operation. To achieve the study's objectives and address the research questions, a case study is performed. The study will consist of a three-step plan. In the first stage, the problem is discussed, a literature study is carried out and suitable methods are identified. The next stage involves gathering information through interviews, observations, and documentation. Data is analysed and evaluated according to lean-principles. In the last phase, improvement proposals are developed based on the analysis. Theoretical approaches include deduction. The study employs both qualitative and quantitative research methods. The improvement suggestions are presented in the results chapter, categorized into general proposals, material handling, mapping, as well as a spaghetti diagram of the future state. The proposals focus on creating a continuous flow in production and minimizing security flaws. In addition, it is justified why a pulling-system and kanban-system should be introduced. The value stream mapping of the future state shows theoretically that the lead time can be halved if the stock size is minimized. The study analysed internal logistics waste and provided a basis for future projects. Using value stream mapping and spaghetti diagram, the authors successfully identified various improvement suggestions. For future research, it is recommended to include areas such as education, economic calculations, PDCA implementation, order and hook analysis, waste reduction, and optimal utilization of production space in the development process. / Globaliseringen har lett till ökad konkurrens mellan företagen, där allt fler väljer att ha verksamheter både i närheten och globalt. Sedan dess har det varit angeläget att stå ut på marknaden genom att arbeta kostnadseffektivt, anpassat till kundens krav, erbjuda korta leveranstider, smart planering av material, med mera. Nya förutsättningar skapas, allt från teknikutvecklingen till nya miljökrav, som har fått företagen att arbeta med förbättringar av materialflöde. Begreppet logistik har börjat uppmärksammas tillsammans med lean-produktion som anses vara ett kraftfullt hjälpverktyg. Syftet med examensarbetet är att få en ökad förståelse för de slöserier som finns i ett företags interna logistikflöde, för att kunna ge förbättringsförslag om hur flödet kan effektiviseras. Målsättningen är att skapa underlag för framtida förbättringar inom logistikflödet i en tillverkande verksamhet. För att uppnå syftet med studien samt kunna besvara frågeställningarna, genomförs en fallstudie. Studien är uppdelad i tre delar. I första stadiet diskuteras problemet, en litteraturstudie genomförs och lämpliga metoder identifieras. Nästa stadie omfattar insamling av information genom intervjuer, observationer och dokumentation. Data analyseras och utvärderas enligt lean-principerna. I den sista fasen presenteras förbättringsförslag baserade på analysen. Teoretiska angreppssätt inkluderar deduktion. Studien använder både kvalitativa och kvantitativa forskningsmetoder. Förbättringsförslagen presenteras i resultatkapitlet, som indelas i generella förbättringsförslag, materialhantering, samt kartläggning och spagettidiagram över framtida tillståndet. Förslagen fokuserar på att skapa ett kontinuerligt flöde i produktionen och minimera säkerhetsbristerna. Därtill motiveras varför ett dragande- och kanban-system ska införas. Värdeflödeskartan över det framtida tillståndet visar teoretiskt sätt att ledtiden kan halveras, om lagerstorlekarna minimeras. Med hjälp av värdeflödesanalys och spagettidiagram lyckas författarna identifiera olika förbättringsförslag. Inför framtida forskning kan följande studeras vidare: utbildning för medarbetare, ekonomisk kalkylering, PDCA-tillämpning, order- och krokanalys, kassationsminimering och optimal användning av produktionsyta i utvecklingsprocessen.
577

Fast vårdkontakt inom nära vård -ett förbättringsarbete om personcentrerat arbetssätt samt en studie ur patient och medarbetarperspektiv / Case management in local health -improvement work concerning personcentred manor an a study following up patient and staff perspecitve

Leitzig, Andrea January 2023 (has links)
Svensk patientlag fastställer att patienter med stort vårdbehov ska ha en fast vårdkontakt (FVK). Inom ramen av god och nära vård ska FVK erbjudas till dessa patienter. FVK förutsätter att vårdpersonalen antar ett personcentrerat arbetssätt och upprättar en hälsoplan i samskapande med patienten. I kontrast upplever sjuksköterskorna att de saknar stöd och kunskap om arbetssättet FVK. Detta leder till att patienterna känner sig otrygga, är frekvent vårdsökande och träffar olika vårdpersonal. Syftet var att förbättra trygghet och kontinuitet för patienter listat på en vårdcentral i Dalarna genom att erbjuda FVK till dessa patienter. Det specifika målet var att erbjuda tolv patienter en FVK inklusive hälsoplan inom sex månader samt att förbättra sjuksköterskornas kunskap om arbetssättet FVK. Syfte med studien var att evaluera om patienter ansåg att deras vårdbehov tillgodoses genom arbetssätt FVK och beskriva sjuksköterskorna erfarenhet av arbetssättet. Förbättringsarbetet inkluderade Nolans’ förbättringsverktyg, patientinvolvering och kunskapshöjande insatser för sjuksköterskor. För att undersöka hur arbetssättet FVK upplevs av patienter och sjuksköterskor genomfördes en mixad-metodstudie. En enkät riktat till patienter utformades och tre fokusgruppintervjuer, en dyad och en enskild intervju med sjuksköterskorna genomfördes. Inom sex månader hade tolv patienter en FVK tilldelad varav tio patienter hade en hälsoplan. Patienterna uttryckte att deras vårdbehov tillgodoses genom arbetssätt FVK vilket stämmer överens med sjuksköterskornas uppfattning att deras patienter söker mindre vård. FVK ökar trygghet och kontinuitet för patienter med stort vårdbehov under omständigheter som tillåter sjuksköterskorna att anta personcentrerat arbetssätt. Patienterna upplever att deras vård förbättrats och sjuksköterskorna att arbetssättet FVK ger mer värde. Studien var småskalig och begränsat till en mindre vårdcentral vilket limiterar dess överförbarhet till andra verksamheter och fler studier behövs. / The Swedish Health law obliges healthcare centers to assign case managers for patients in need. Good quality in local health care thus includes providing case managers. The case manager method presupposes that care staff adopts a person-centered manor and creates care in co-production with the patients. In contrast the nurse lacks support and knowledge to provide case management. This results in patients feeling insecure, seeking frequently for health related afflict and meeting various caregivers. To improve safety and continuity for patients in need one healthcare center in the county of Dalarna has decided to provide case management for patients assigned to the center. The specific goals were to assign twelve patients to a case manager, including health care plan within six months, and to increase knowledge for nurses. Aims of the study were to describe patients’ perception whether they consider if their needs are accommodated by the case manager, and nurses’ experiences to work as a case manager. Nolans’ improvement tool was used involving patients in their care as well as training nurses in case management skills. To study the effect of case management on patients and nurses a mixed-method design was conducted. A patient questionnaire was performed and three focus group interviews, one dyad and one individual interview with nurses were conducted. Twelve patients were assigned a case manager after six months. Ten patients had an established care plan. The patients expressed that their need of care was accommodated which is in coherence with the nurses who described that their patients were in less need for care. Case managers improve safety and continuity for patients in need under circumstances that allow nurses to develop person-centred manor. Patients expressed care improved and nurses increased work values. Yet this survey was limited to a small unit and further studies are needed.
578

Archiv-Analysen Teil 3: Dokumentation als Teil der Produktion - RIMINI PROTOKOLL: Auf der Grundlage eines Gesprächs mit Helgard Haug und Juliane Männel

Ortmann, Lucie 08 May 2023 (has links)
Im Rahmen des Forschungsprojekts 'Verzeichnungen. Medien und konstitutive Ordnungen von Archivprozessen der Aufführungskünste' interessierten wir uns für die Archivierungsprozesse von Rimini Protokoll. Wie dokumentiert die medial-technisch versierte Künstler:innengruppe ihre Arbeit? Gibt es so etwas wie ein kontinuierlich betriebenes Archiv? Dieser Bericht bildet den dritten Teil der Reihe Archiv-Analysen. Er basiert auf einem Gespräch, das wir bereits 2016 führten und ist in insofern auch ein Griff ins Archiv des Forschungsprojekts. Archiv-Analysen richten sich auf die Praktiken des Sammelns und die Prozesse des Erschließens und Nutzens verschiedener Akteur:innen und Institutionen im Bereich Performancekunst/Freie Theater- und Tanzszene. Teil 1 beschäftigte sich mit dem HAU Hebbel am Ufer, Berlin (MAP #8) und Teil 2 mit dem Haus der Kunst, München und dem steirischen herbst, Graz (MAP #9).
579

Så bekämpas det ohållbara konsumtions- och produktionsmönstret : En kvalitativ studie om hur träförädlingsindustrin arbetar med FN:s globala mål nummer 12 / This is how the unsustainable consumption and production pattern is combated : A qualitative study on how the wood processing industry works with the sustainable development goals number 12

Gustavsson, Filippa, Nyroos, Mathilda January 2022 (has links)
Syfte:Syftet med denna studie är att genom en jämförelse mellan olika företag inom träförädlingsindustrin skapa en förståelse för hur arbetet med hållbar konsumtion och produktion går till. Metod:Uppsatsen bygger på en kvalitativ metod med en induktiv ansats. Genom ett hermeneutiskt synsätt har en systematisk tolkning och förståelse gjorts utav de fem intervjuade företagen för att kunna besvara frågeställningen. Intervjun följde en semistrukturerad metod med hjälp av en intervjuguide. Slutsats:För att bekämpa de ohållbara konsumtion och produktionsmönster som idag existerar kan vi konstatera att företag inom träförädlingsindustrin försöker att påverka detta genom sitt arbete. Arbetet är till största delen liknande, detta med tanke på de delmål som finns till det globala målet nummer 12 hållbar konsumtion och produktion. Viktiga komponenter i arbetet är hantering av avfall och kemikalier samt att minska avfallen. / Aim:The aim of this study is to create an understanding of how the work with sustainable consumption and production takes place through a comparison between different companies in the wood processing industry. Method:This bachelor’s thesis is based on a qualitative method with an inductive approach. Through a hermeneutic approach, a systematic interpretation and understanding has been made of the five companies interviewed in order to be able to answer the question. The interview followed a semi-structured method using an interview guide. Conclusion:In order to combat the unsustainable consumption and production patterns that exist today, we can state that companies in the wood processing industry are trying to influence this through their work. The work is similar, given the sub-goals that exist for the global goal number 12 sustainable consumption and production. Important components in the work are waste management and chemicals and reducing waste.
580

FÖRETAGENS ROLL INOM UTVECKLING AV BIM.- Betydelse av företagens storlek. / THE ROLE OF COMPANIES IN THE DEVELOPMENT OF BIM - The importance of the size of the companies

Demir, Hamdullah, Ahmad, Ali January 2022 (has links)
Dagens teknik och digitalisering utvecklas ständigt. Denna utveckling medför att mängder av dagens byggföretag behöver anpassa sig med utvecklingen genom att övergå från att arbeta med diverse ritningar i 2D-format till att arbeta med samordnade modeller i 3D-format. En relativt tydlig problematik med detta är att många av dessa byggföretag ligger fortfarande efter i teknikens utveckling på grund av olika faktorer. En lösning för att motverka detta problem är att tillämpa BIM i verksamheten. Däremot har studier visat att företagens möjligheter till att påverka utvecklingen av BIM skiljer sig beroende på företagets resurser i form av arbetskraft samt ekonomiska förutsättningar.   Syftet med studien är att jämföra och undersöka hur storleken på olika företag varierar i användningen av BIM utifrån företagens omsättning och antalet anställda. Vidare är syftet att undersöka hur företagen bidrar till branschens utveckling inom BIM samt de möjligheter som finns för att utveckla BIM. Metoden som används under studiens gång är litteratur- och enkätstudier. Litteraturstudien används för att samla in och erhålla kunskap kring BIM och dess utveckling i branschen. Enkätstudien utförs hos sex olika företag för att analysera och jämföra hur företagen arbetar med BIM i deras verksamhet. Resultaten visar att de större företagen generellt ligger i framkant i utvecklingen av BIM. De större företagen tillämpar BIM i större utsträckning än de mindre företagen som enbart tillämpar BIM utan någon tydlig struktur i verksamheten. Resultaten visar också ett tydligt samband på att företagens storlek har en betydande roll om företaget kan bidra till utvecklingen av BIM utifrån deras befintliga omsättning och antalet anställda.   Slutsatsen är att de större företagen ligger längre fram i utvecklingen av BIM. De större företagen har mer tillgångar i form av resurser, flera anställda och en högre omsättning i jämförelse med de mindre företagen. Detta beror också på att de mindre företagen har ett mindre engagemang av att implementera BIM i deras verksamhet, vilket leder till att mindre företag har begränsade möjligheter i att påverka arbetet och utvecklingen av BIM. / The technology and digitization are constantly evolving today. This development means that many of today's construction companies need to adapt to the development by switching from working with various drawings in 2D format to working with coordinated models in 3D format. A relatively clear problem with this is that many of these construction companies are still lagging in the development of technology due to various factors. One solution to counteract this problem is to apply BIM in the business. However, studies have shown that the possibilities of influencing the development of BIM vary according to the resources of the enterprises in the form of working and economic conditions. The purpose of the study is to investigate and compare how the size of different companies varies the use of BIM in terms of their turnover and number of employees. Furthermore, the purpose is to study how companies contribute to the development of the industry within BIM and the opportunities that exist to develop BIM. The method used during the study is a literature and questionnaire studies. The literature study is used to collect and obtain knowledge about BIM and its development in the industry. The survey is conducted at six different companies to analyze and compare how the companies work with BIM in their operations.  The results show that the larger companies are generally at the forefront of the development of BIM. The larger companies apply BIM to a greater extent than the smaller companies that only apply BIM without any clear structure in the operations. The results also show a clear connection that the size of the companies has a significant role if the company can contribute to the development of BIM based on their existing turnover and number of employees. The conclusion is that the larger companies are further ahead in the development of BIM. The larger companies have more assets in the form of resources, more employees and a higher turnover in comparison to the smaller companies. This is also depending on that the smaller companies have less commitment to implementing BIM in their operations, which leads to smaller companies having limited opportunities to influence the work and development of BIM.

Page generated in 0.031 seconds