• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 18
  • 2
  • Tagged with
  • 20
  • 6
  • 5
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Att möta klienter på fritiden : En kvalitativ studie om socialsekreterares upplevelser av att arbeta och leva i en liten kommun

Bergström, Magnus, Carlström, Torbjörn January 2019 (has links)
Syftet med studien var att undersöka hur socialsekreterare som arbetar med myndighetsutövning i en mindre kommun upplever och hanterar möten med klienter i sin privata roll i samhället kopplat till deras yrkesroll. Den metod vi använde oss av var kvalitativ metod och empirin samlades in genom intervjuer. Vår data kopplades till systemteori och rollteori. Vår analys och resultat visade att socialsekreterarna var påverkade av mötet med klienter även om de själva uppgav att de inte var påverkade och att mötena hanterades på olika sätt utifrån situation och plats. Detta utifrån resultatet som uppvisade att socialsekreterarna har många liknande, men även skilda upplevelser och hantering av dessa. Studien visade även att det fanns både fördelar och nackdelar med att bo i en liten kommun. En fördel kunde bland annat vara närheten till andra organisationer, som i sin tur underlättade samarbete. En nackdel kunde vara den risk som fanns för att möta klienter som ville diskutera sin situation utanför den professionella sfären. Utifrån resultatet visade det sig även att en del av socialsekreterarna kunde ha svårt att inte vara professionella på sin fritid, utan anpassade sina privata liv efter sitt yrke.
12

Hela Tyskland i nationellt festrus tacke vare dåren hitler! : En undersökning av fem olika dagstidningar före och under andra världskriget

Lindén, Max, Forshage, Andreas January 2018 (has links)
Arbetet handlar om hur olika tidningar i Sverige framställer nazistregimen i Tyskland före och under andra världskriget i sina rubriker. Syftet är att ta reda på vilka skillnader och likheter som finns mellan lokala tidningar, tidningarna själva över tid, lokala tidningar över tid, lokal respektive rikstidning och lokal respektive rikstidning över tid. Materialet som ligger till grund för undersökningen är fyra lokala tidningar samt en rikstidning. Därutöver har vi konstruerat en analysmodell med inspiration från Asp (2011) mediernas betydelse, valet 2010och Lundgren (1999) Nyheter- att läsa tidningstext. Undersökningen visar på att det finns skillnader och även likheter mellan de olika lokaltidningarna. Dessutom påvisar undersökningen att det finns skillnader över tid mellan vissa lokaltidningar och att vissa lokaltidningar också förändrar sig över tid. Undersökningen påvisar också skillnader mellan lokaltidningar och rikstidningen.
13

Opera i Stockholm, Galärvarvet

Törngren, Anders January 2011 (has links)
En ny Opera på Galärvarvet i Stockholm. Klippformad volym som landar i vattnet och sveper ner över land. Absolut närhet till Stockholms hjärta, vattnet, samt influenser från kobbar och skär från stockholm yttre skärgård.
14

Barriers for Wide Adoption of LCA in the Swedish Construction Sector : An Interview Study on Bbarriers and How They Differ Between Big and Small Actors / Barriärer för bred implementering av LCA i den svenska byggsektorn : En intervjustudie av barriärer och hur de skiljer sig mellan stora och små aktörer

Vogt Thorell, Fredrik January 2019 (has links)
Research suggests that the construction industry plays a crucial role in the fight against climate change and global warming. In 2010, the building sector answered for 30% of the global CO2 emissions and 32% of the total energy use. By adopting life-cycle assessments (LCA), the construction companies have a chance to improve indicators for economic, social and environmental sustainability. The Swedish government is in the process of making climate declarations of buildings, through LCA, a requirement to steer the industry towards more sustainable development.This study aims to show what barriers there are for wide adoption of LCA in the Swedish construction sector today and how these barriers are related to the rate of adoption. Furthermore, the study aims to investigate if there are differences in barriers between big and small actors in the industry. The study is guided by the theory “Diffusion of Innovations” by Everett Rodgers. The main method for data collection has been semi-structured interviews with people in the Swedish construction industry.The main barriers identified were lack of demand and lack of regulation. The study shows that the relative advantage of LCA is not perceived as high enough for it to be widely adopted without an increase in demand. It is also shown that high demand on a wide front is unlikely to happen without regulation. Furthermore, this study shows that the barriers are the same for actors of different sizes. The difference is the ability to deal with the barriers. Much of that ability can be ascribed to how much resources are available within the company. / Forskning tyder på att byggbranschen spelar en avgörande roll i kampen mot klimatförändringar och global uppvärmning. Byggnadsbranschen svarade 2010 för 30% av de globala koldioxidutsläppen och 32% av den totala energianvändningen. Genom att anta livscykelanalyser (LCA) har byggföretagen möjlighet att förbättra indikatorerna för ekonomisk, social och miljömässig hållbarhet. Den svenska regeringen håller på att göra klimatdeklarationer av byggnader, genom LCA, till ett krav för att styra industrin mot en mer hållbar utveckling.Denna studie syftar till att visa vilka hinder det finns för bred implementering av LCA i den svenska byggbranschen idag, och hur dessa hinder är relaterade till upptagandet. Vidare syftar studien till att undersöka om det finns skillnader i hinder mellan stora och små aktörer i branschen. Studien guidas av teorin "Diffusion of Innovations" av Everett Rodgers. Huvudmetoden för datainsamling har varit semi-strukturerade intervjuer med utvalda personer i den svenska byggbranschen.De viktigaste hindren som identifierades är brist på efterfrågan och brist på reglering. Studien visar att den relativa fördelen av LCA inte uppfattas som tillräckligt hög för att den ska vidtas allmänt utan att efterfrågan ökar. Det visas också att hög efterfrågan på en bred front sannolikt inte kommer att ske utan reglering. Vidare visar denna studie att hindren är desamma för aktörer av olika storlekar. Skillnaden är förmågan att hantera barriärerna. Mycket av den förmågan kan hänföras till hur mycket resurser som finns inom företaget.
15

Ett alternativt familjebegrepp : Queerläsning av tre nutida, svenska bilderböcker

Åström, Anne January 2015 (has links)
Undersökningens syfte är att göra en queeranalys av gestaltningen av temat familj i ett urval av nutida, svenska bilderböcker för barn. Undersökningens frågeställningar lyder: Vilken förståelse av begreppet familj kan en queerläsning ge utifrån antagandet att bilderböckernas respektive karaktärer tillsammans utgör var sin familj och vilka kriterier kan lägga grunden till alternativa definitioner av begreppet familj? De tre litterära verk som undersöks är Sune börjar skolan av Sören Olsson och Anders Jacobsson (Rabén & Sjögren, 1997), När Findus var liten och försvann av Sven Nordqvist (Opal, 2001) samt Mamma Mu städar av Jujja och Tomas Wieslander med illustrationer av Sven Nordqvist (Natur och Kultur, 1997). Undersökningens frågeställningar besvaras med att alla tre litterära verk har potential att läsas queert. Undersökningen resulterar i ett antal kriterier som kontrasteras mot en traditionell definition av familj formulerat av Nationalencyklopedin, det vill säga kriterierna kan tillsammans utgöra en alternativ definition av begreppet familj.  Uppsatsen avslutas med en diskussion om bilderboken i samhället, nyttan av att läsa queert samt uppslag för framtida forskning.
16

Kommuners förhållningssätt till regeln om reduktion av bygglovsavgiften : en studie av fyra kommuner inom Västra Götaland / How do the local authorities relate to the paragraph about reduction of the building permit fee?

Carlson, Freddie, Zurowetz, Sebastian January 2019 (has links)
När plan- och bygglagen (PBL) reviderades 2011 tillfördes ett krav på kommunerna att handlägga ett bygglovsärende inom tio veckor från det att ärendet blev komplett. Det infördes dock inga sanktioner mot kommunerna om de skulle överskrida tidsfristen. Efter flera utredningar av bland andra Boverket har det visat sig att kommunerna har svårt att hålla tidsfristen. Justitieombudsmannen (JO) har flertalet gånger sedan revideringen 2011 kritiserat kommuner som inte haft en rimlig handläggningstid. Regeringen gav 2016 Boverket i uppdrag att undersöka hur kommunerna förhåller sig till tidsfristen samt att ta fram ett förslag om sanktionssystem mot byggnadsnämnden när de överskrider tio veckor. Syftet med uppdraget var att kommunerna skulle förbättra sina handläggningstider och att byggprocessen skulle bli mer effektiv. Boverket konstaterade i sin rapport att 81 procent av kommunerna klarar av att handlägga majoriteten av sina ärenden inom tidsfristen och att kommunerna succesivt har förbättrat sina handläggningstider sedan 2011 års PBL infördes. Boverket ansåg i rapporten att införandet av en reducerad bygglovsavgift var det mest lämpliga system att införa mot nämnderna. Reducering av bygglovsavgift infördes i PBL den 1 januari 2019 genom paragraf 12:8 a. Reduceringen innebär att bygglovsavgiften ska minskas med en femtedel för varje påbörjad vecka som överskrider tidsfristen. I denna studie har det undersökts vilken inverkan den nya regeln har fått på utvalda kommuner, och hur kommunerna förhåller sig till den. Studien är avgränsad genom att fokus har riktats mot bygglov utanför detaljplan, liten avvikelse inom detaljplan och vid större projekt. Studien bygger på intervjuer med bygglovschefer eller handläggare i fyra kommuner i Västra Götalands län, där tre av kommunerna valdes efter befolkning och den fjärde valdes för att representera en kommun med stor andel säsongsboende. Inför intervjuerna har de intervjuade fått till sig en intervjuguide och under intervjuerna har samma grundfrågor ställts med möjlighet till fördjupade följdfrågor. Resultatet visar att 12:8 a inte kommer att få en stor inverkan på kommunerna och därmed inte leda till en mer effektiv byggprocess. Orsaken till detta är att lagändringen är en liten del i hela kedjan med en avsaknad av tidsfrister inom andra delar av byggprocessen. Nu kommer kommunerna att flytta resurser till den del som är tidsstyrd medan andra moment i processen blir nedprioriterade. Utifrån resultatet är slutsatsen att hela byggprocessen bör ses över. Paragraferna inom själva PBL men även andra lagar bör samverka bättre med varandra, och att den vägledningen som Boverket ska ge till kommunerna bör bli tydligare då kommunerna tolkar lagar olika. Sammantaget har 12:8 a inte fått någon större påverkan på byggprocessen och PBL:s syfte om en enklare plan- och bygglag fortsätter att motverkas. / The Planning and Building act (PBL) was rewritten in 2011. A new requirement was added for the local authorities to handle building permits within ten weeks from when the applications were completed. However there were no sanctions added against the local authorities if they were to exceed the deadline of ten weeks. Several investigations performed by, for example Boverket, show that the local authorities have difficulties meeting the deadline. JO has several times, since the readjustment in 2011, complained to local authorities of their unreasonable processing time. In 2016 the government gave Boverket an assignment to investigate if the local authorities are meeting the deadlines and to propose a sanction system for the building committees, if they exceed the ten weeks. The purpose of the assignment was to improve the local authorities' processing time and to make the building process more effective. The report from Boverket showed that 81 percent of the local authorities handle a majority of the building permits within the deadline and that the processing time has improved every year since the Planning and Building act was rewritten in 2011. It was stated in the report from Boverket, that a reduction of the building permit fee was the most suitable penalty to use against the local authorities for a time violation. The reduction of the building permit fee was introduced in PBL on the first of January 2019, and was stated in paragraph 12:8 a. The penalty is structured so that every started week that exceeds the deadline, the building permit fee will be reduced by a fifth. In this study it has been analysed what impact the rule has had on four local authorities and how they interpret the rule. The study has been limited to and is only focused on building permits that are outside of the detailed plan, with minor deviance from the detailed plan and building permits for major buildings. The study is based on interviews with the manager in the department of building permit in four different local authorities located in Västra Götaland. Three of the local authorities were chosen based on size of population and the fourth was chosen to represent a local authority that has major seasonal accommodation. Before every interview the interviewees have been given an interview guide, and during the interviews the same basic questions have been asked with an opportunity to ask in-depth follow-up questions. The result showed that 12:8 a will not have a significant impact on the local authorities and therefore will not result in a more effective building process. The reason for this is that the new regulation is only a small part in the bigger picture and has a lack of deadlines in other parts of the building process. This will lead to local authorities simply moving resources to the area that has a deadline, while other steps of the process will not be as prioritized. The conclusion from these findings show that the whole building process should be looked over. The rules within PBL should be better aligned with each other and also with other laws. The guidance that Boverket gives to the local authorities should also be clearer, since local authorities can interpret the law differently. Overall, the 12:8 a paragraph will not have a big impact on the building process. The purpose of PBL on a simpler Planning and Building act continues to be sidestepped.
17

Mindre avvikelse från detaljplan : Kartläggning och undersökning av tillåtna mindre avvikelser från detaljplan i Umeå kommun år  2012

Ljung, Elise January 2013 (has links)
Umeå University, Sweden, 2013 Title: Mindre avvikelse från detaljplan - Kartläggning och undersökning av tillåtna mindre avvikelser från detaljplan i Umeå kommun år 2012 English title: Minor deviation from local plan – Survey and analysis of allowed minor deviations from local plan in the municipality of Umeå, Sweden year 2012 Author: Elise Ljung Language: Swedish, with an English abstract Department: Department of Geography and Economic History   The aim with this essay is to analyse the frequency of minor deviations from the local plans in the municipality of Umeå year 2012. The analysis includes what kind of building arrangements that are deviating from the local plan, in what way these buildings are deviating, what kind of buildings that are concerned of deviations and what kind of applicants that apply for building permits that are deviating from the local plan. The provisions that are concerning minor deviations are presented in the results. The analyse is also investigating why deviations are made from the social plans and how the spatial distribution of minor deviations are in the municipality of Umeå and the urban areas of Umeå.   The survey is made from datasets provided by the office of building permits in the municipality of Umeå. The data has been encoded and categorised into four main categories; Type of applicant, type of building, type of building arrangement and type of deviation from local plan. The mapping of data has been made using the property map provided by the Ordnance Survey of the municipality of Umeå.   According to the survey extensions of buildings applied for by private housing owners are the most common minor deviations that are allowed and the deviation from the plan are placement of the extension part. The minor deviations are not a spatial phenomenon in the municipality of Umeå. The occurrence of minor deviations is evenly distributed in the municipality and in the urban areas as well. Provisions of the Planning -and Building act says that a minor deviation from the local plan can be made under conditions that the deviation is small and do not contradicts against the aim of the local plan.
18

Lovet på landet : En rättsdogmatisk studie av 9 kap. 6 § PBL / Permits in the countryside

Engblom, Tove, Gunnarsson, Lisa January 2018 (has links)
När äldre plan- och bygglagen, ÄPBL ersattes år 2011 av dagens plan- och bygglag, PBL fick paragrafen gällande bygglovsbefriade åtgärder några språkliga uppdateringar. Ändringarna var avsedda att förenkla och uppdatera tolkningen. Några ändringar i hur bygglovsbefrielsen på glesbygden ska bedömas var ej avsedda. Denna studie granskar ett flertal av Sveriges kommuners tolkning av bygglovsbefrielsen enligt 9 kap. 6 § PBL. Granskningen gjordes via en enkätundersökning, resultaten jämfördes och sammanställdes. För att kunna avgöra huruvida kommunerna gjort en korrekt bedömning har studien även gjort en grundlig juridisk granskning av lagtext och förarbeten. 9 kap. 6 § PBL är en komplicerad paragraf och kan inte tolkas utan att läsa förarbetena. Tyvärr räcker det inte med att läsa propositionerna till PBL. Även de förarbeten som finns till ÄPBL måste läsas för att förstå innebörden. Paragrafen har sedan 1987 genomgått flertalet uppdateringar, därav är informationen utspridd. Bygglovsbefrielsen i denna paragraf riktar sig till fastighetsägare till en- och tvåbostadshus på glesbygden som vill uppföra en liten tillbyggnad eller komplementbyggnad i omedelbar närhet till bostadshuset. Kravet är att det på fastigheten finns ett bostadshus och att byggnaderna ska vara ett komplement som inte dominerar över bostadshuset. Fastighetsägaren behöver inte anmäla eller rådfråga byggnadsnämnden utan ska själv kunna bedöma om reglerna går att tillämpa. Att gemene man, utan juridiska förkunskaper ska kunna tolka en komplicerad paragraf är bekymmersamt. Konsekvenserna av en felbedömning är kostsamma. Tyvärr finns inte mycket till vägledning att få av kommunerna, då resultatet av enkätundersökningen visat att nästan alla byggnadsnämnder gör en felaktig bedömning av paragrafen. Studien belyser problematiken med att överlåta tolkningen av en komplicerad paragraf till fastighetsägarna. Att kommunerna sätter egna bestämmelser kring tolkningen av paragrafen utan uppsikt från överordnad myndighet gör inte problemen färre. Slutsatsen för denna studie resulterar i att bättre vägledning och hårdare krav på kommunerna måste införas för att inte lägga över för stort ansvar på de enskilda. / When the older planning and building act was replaced in 2011 by todays planning and building act, the paragraph regulating permits exempt buildings actions received some linguistic updates. The updates where intended to simplify and update the interpretation. Any changes in the countryside in how this was supposed to be interpreted was not intended. This thesis examines how multiple Swedish municipalities interpret the permits exempt buildings according to 9 chap. 6 § planning and building act. The examination was done with a survey sent to all Swedish municipalities, which was then put together and the results where compared. To be able to decide if the municipalities have been making correct interpretations this thesis have also made a thorough legal examination of the law and preliminary work. 9 chap. 6 § planning and building act is a complicated paragraph and cannot be interpreted without reading the preparatory work. Unfortunately, just reading the propositions to the planning and building act is not enough. The preparatory work for older planning and building act must also be read to fully grasp the meaning of the law. The paragraph has gone through multiple updates since 1987, therefor the information has been spread out. The permits exempt buildings in this paragraph is aimed at property owners owning houses with one or two families in the countryside that want to erect a small extension for the house or a complimentary building adjacent to the main building. The condition is that there is a house on the property and that the building is of a complementary nature to not dominate over the actual main house. The property owner does not need to report to or consult with the municipality but is rather supposed to judge if the rules are applicable for them self.T hat the average citizen, without basic legal education, is supposed to be able to interpret a complicated paragraph like this is troublesome. The consequence of a misjudgement is expensive. Unfortunately, there is not a lot of guidance to be had from the municipalities since our survey shows that almost all Building Department are making incorrect decisions based on interpreting the paragraph incorrectly. This thesis shines a light on the problem with assigning a complicated paragraph to be interpreted by the property owners. Furthermore, allowing the municipalities to make their own regulations regarding the interpretation of the law, without accountability to superior government agencies does not make the problems fewer. Our conclusion with this thesis results in that better guidance and stricter demands on the municipalities must be enacted to not place too big of a responsibility on the individual citizen.
19

Modellering, simulering och analys av kärnreaktorn BWRX-300

Backlund, Erik January 2023 (has links)
The demand for fossil-free energy production is rising due to electrification and increased consumption in the energy system. There are also multiple climate goals to reach, to preserve the possibilities of a sustainable future. A response to this is the BWRX-300, a natural circulation boiling water small modular reactor (SMR) concept developed by GE Hitachi Nuclear Energy. It is currently at the forefront of study for many power utility companies around the world. For decision making it is of interest to investigate the capabilities of new facilities. This Master Thesis work's aim is to study the BWRX-300 reactor's feasibility together with evaluating and optimizing its performance using the core simulation softwares Casmo5 and Simulate5. This is carried out by first verifying Simulate5's natural circulation capabilities by modifying an existing forced-circulation reactor to natural circulation, then comparing simulation results to real world data.  Next a comprehensive model of the BWRX-300 reactor pressure vessel is modelled and validated. Equilibrium cores for 12- and 24-month cycle lengths are then simulated where key reactor performance metrics such as fuel economy, safety margins, axial profiles (of voids and pressure drop) and reactor characteristics are extracted. The effect of different fuel assembly designs in the BWRX-300 reactor core is investigated to find first core design optimums. Furthermore the decay heat removal system in the BWRX-300 is investigated. Lastly the results are used to evaluate the optimal operating mode given the current and future more dynamic projected state of the energy system.  The results show that there are no real technical difficulties while operating the BWRX-300 reactor for 12 or 24 months. The decay heat removal system and core flow characteristics provide abundant coolant flow to maintain long term fuel integrity during both normal and abnormal operation modes. More or less routine core design optimization work is required to obtain sufficient safety margins and improve fuel economy. It is observed that the smaller reactor core requires an increase in average fuel enrichment to maintain criticality throughout the cycle, potentially creating an incentive to raise the current licensing limit. However it is deemed possible to avoid this by conducting further fuel design optimization work.
20

UTREDNING KRING TOLKNINGEN AV ”LITEN AVVIKELSE” / INVESTIGATION ON THE INTERPRETATION OF ”SMALL DEVIATION”

Arveståhl, Beatrice, Lehtinen, Susan January 2017 (has links)
Purpose: In Sweden, a municipal plan monopoly is used to regulate what, how and where you can or cannot build. How the plans, in the shape of comprehensive and detailed development plans, are formed is in turn regulated by the Planning and Building Act (PBL). Throughout history, Swedish building regulations have gone through many more or less extensive changes with the overall goal to improve our built environment and simplify or streamline the planning and building processes. From this comes the term small deviation, which in PBL is used to allow building permits that deviate from the detailed development plan, provided that the deviation is small. There is, however, no explanation in the law as to what this might mean in practice, and so there are large differences in terms of interpretation and application. The goal of this study is to analyse how the term small deviation according to PBL, chapter 9 § 31b is interpreted and applicated in building permit trials. Method: The methods used in this study are interviews (with building permit officers) and document analysis (of building permit decisions from quarter two, 2016, and court cases from the Land and Environment Court of Appeal). Findings: How deviations are interpreted does indeed vastly differ, and while the municipalities do work in a similar manner to determine whether a deviation could be considered small, there are significant differences. Only in the matter of built area on a property, the three studied municipalities all have different practices in what size of violation may be considered small, and the building permit officers in one of these municipalities still deviate from this. In eight out of 13 court cases, the Land and Environment Court of Appeal judged differently from the previous authorities. Only in one did all authorities agree. Implications: The findings implicate the following: There are remarkable differences in how small deviation is assessed. De biggest differences are between the local building permit officers and the Land and Environment Court of Appeal. The factors that affect the assessment on a municipal level the most are experience, precedent cases and discussion with colleagues. Limitations: A wider study containing more information from several municipalities and an analysis of the material accessible to the municipalities for guidance to assess deviations would provide a clearer answer as to what affects the interpretation. Keywords: PBL, Planning and Building Act, building permits, law interpretation, interpretation, deviation, small deviation, deviation from detailed development plan, sensemaking, the Land and Environment Court of Appeal / Syfte: I Sverige används ett kommunalt planmonopol som regleras av Plan- och bygglagen (PBL) 2010:900. Planerna i form av översikts- och detaljplaner reglerar vad, hur och var man får eller inte får bygga. Genom åren har PBL många gånger genomgått mer eller mindre omfattande förändringar med det övergripande syftet att förbättra svensk byggd miljö och förenkla eller effektivisera plan- och byggprocessen, därför har begreppet liten avvikelse tillkommit i PBL. I författningen framgår att det trots avvikelser från planbestämmelser är möjligt att bevilja bygglov, förutsatt att avvikelsen är liten. Det saknas dock förklaringar i PBL kring vad detta kan innebära, och stora skillnader i bedömningen kring vad som kan anses vara en liten avvikelse finns. Målet med arbetet är att analysera hur begreppet liten avvikelse enligt PBL, kap 9 § 31b tolkas och appliceras vid bygglovshandläggning. Metod: De metoder som använts i undersökningen är intervjuer (med bygglovshandläggare) och dokumentanalys (av bygglovsbeslut kvartal två, 2016, och rättsfall i Mark- och miljööverdomstolen från 2016). Resultat: Resultatet visar att det finns stora skillnader i hur liten avvikelse tolkas och appliceras, både mellan olika instanser och på kommunal nivå. Medan kommunerna använder dylika metoder för att avgöra om en avvikelse kan anses vara liten, finns det även avsevärda skillnader i bedömningen. Bara när det gäller byggrätt har kommunerna i undersökningen riktvärden det är stor skillnad på. I åtta av 13 fall bedömde Mark- och miljööverdomstolen olika från samtliga tidigare instanser, och bara i ett fall var samtliga överens om graden av avvikelse. Konsekvenser: De slutsatser som kan dras från resultatet är att: Det finns anmärkningsvärda skillnader i hur liten avvikelse bedöms. De största skillnaderna är mellan den lokala nämnden och Mark- och miljööverdomstolen. Det som främst påverkar bedömningen på kommunal nivå är erfarenhet, prejudicerande rättsfall och diskussion med kollegor. Begränsningar: En bredare undersökning med fler kommuner och bygglovsbeslut från en längre tidsperiod i kombination med en analys av det material som finns för att hjälpa bygglovshandläggare bedöma avvikelser hade kunnat ge ett tydligare svar på vad som påverkar tolkningen. Det hade också gett ett tydligare svar på hur skillnaderna huvudsakligen ser ut, vilket i sin tur gjort det möjligt att ta fram förslag till lösningar. Nyckelord: PBL, Plan- och bygglagen, bygglov, lagtolkning, tolkning, avvikelse, liten avvikelse, avvikelse från detaljplan, meningsskapande, MÖD, Mark- och miljööverdomstolen

Page generated in 0.0494 seconds