• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 22
  • 5
  • Tagged with
  • 27
  • 9
  • 7
  • 7
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Gångavstånd till utrymningsvägar : En studie om gångstånden till utrymningsvägar och dess dimensioneringsmöjligheter med hjälp av förenklad dimensionering / Distances to evacuation routes : A study of walking distances to escape routes and its design possibilities using simplified dimensioning

Ullström, Stefan January 2015 (has links)
ABSTRACT The title of this degree project after  three years long education of construction engineering is “Distances to evacuation routes” with the subtitle “A study of walking distances to escape routes and its design possibilities using simplified dimensioning”. The idea for the project came from the company Fire AB in Västerås. They are oriented in fire protection dimensioning. When specifying the fire protection for a building you can choose from two different methods, simplified dimensioning or analytical dimensioning. The simplified dimensioning is an easier way of designing the fire protection, you just follow the rules in BBR given by the swedish national board of housing, bulding and planning. Analytical dimensioning is a more complicated method which places higher demands on the user. In some cases analytical dimensioning is a demand. There has been a problem with the simplified method when you dimension the distance to an emergency exit. The maximum distance to an escape route is given in BBR 19/20 and can’t be exceeded at any time. If you have a distance of 31 meters and the acceptable distance is 30 m you would have to solve it with analytical dimensioning, but if you have a normal ceiling height this is very difficult because the calculation values are very high compared to the values used in simplified dimensioning. The only way to get that extra meter accepted is to install some kind of fire alarm which increases the cost of the building. Before BBR 19/20 you could do a report with a risk analysis of that extra meter. That extra meter is often a corner in a room and doesn’t affect the evacuation. When you calculate that extra meter it will affect the evacuation time considerably but in reality it doesn’t make any major difference. It’s not reasonable to install a fire alarm that increases the cost of the building with an extra hundred thousand SEK. The question that will be answered is: How has the maximum walking distance to escape routes changed over time in the different regulations? The requirements for walking distances to escape routes being used today, how where these created and have they been tested in any way? How do they do in Norway, Finland and New Zealand when they decide the maximum distance to an escape route? What do the calculations say? Would a longer distance to an escape route or a higher ceiling height be better for the people that evacuate? There are differences in the maximum distance to an escape route between the countries that has been compared in this essay. In some cases has Norway and Finland has a longer distance than Sweden but overall they are very simlilar. New Zeeland is the country with the longest walking distance in all scenarios. In some cases New Zeeland has the double amount of meters than Sweeden to an escape route. The capter about walking distances to an escape route in the swedish ordinance “Boverkets byggregler” has looked almost the same since 1975. It is time for that chapter to be revised after todays building techniques and materials.  Keywords: distance, evacuations, routes, fire, dimensioning, housing, building and planning. / SAMMANFATTNING När en byggnad konstrueras är utrymningssäkerheten för byggnaden väldigt viktig. En del inom utrymningssäkerhet är gångavstånden till utrymningsvägar. Det maximalt tillåtna gångavståndet till utrymningsvägarna bestäms med hjälp av tabellvärden genom förenklad dimensionering eller genom att beräkna tiden till kritiska förhållanden och därefter beräkna maximala gångavstånd detta kallas analytisk dimensionering. Det förstnämnda har behandlats i detta arbete. Med hjälp utav förenklad dimensionering bestäms det maximala gångavstånden till utrymningsvägar efter vilken typ av verksamhet samt dess förutsättningar som råder i det tänkta utrymmet. Max tillåtna gångavstånd varierar från 15 m upp till 60 m beroende på verksamhetsklass och förutsättningar. Syftet med detta arbete är att utreda metoden för att ta fram de längsta gångavstånden samt hur relevant denna är i dagsläget, ytterligare ett syfte är att jämföra denna metod mot Norge, Finland och Nya Zeelands metod för att bestämma längsta gångavstånd. Arbetet består av en litteraturstudie som är baserad på lagtext från de olika länderna. Intervjuer har gjorts med människor som jobbar inom det berörda området i de olika länderna. En teoretisk del presenteras i slutet på arbetet i form av beräkningar, där användes datorsimuleringsprogrammet CFast. Från och med 1947 fram tills idag så har det funnits 4 olika regelverk för byggande i Sverige som alla behandlat gångavståndskraven till utrymningsvägar. Dessa regelverk är Byggnadsstyrelsens anvisningar till byggnadsstadgan (BABS) 1947-1967, Svensk byggnorm (SBN) 1968-1989, Boverkets nybyggnadsregler (NR) 1989-1994 och Boverkets byggregler (BBR)1994-. I BABS var kraven näst intill obefintliga, det kom krav om gångavstånd till utrymningsvägar för bostäder 1960 men nämndes ytterst kort. Till BABS 1960 kom de första kraven som var indelade efter verksamhetsklasser och förutsättningar, det hade dock inget krav för verksamheter där det förelåg en hög risk för bränder. I SBN 1975 infördes gångavståndskraven som används än idag med den enda skillnaden att brandbelastningen för 60 meters gångavstånd är 250MJ/m2 golvarea istället för 40 MJ/m2 omslutande area. I NR användes också denna tabell för att bestämma det maximala gångavståndet till utrymningsvägar. När BBR 1 kom gick man över från detaljkrav till funktionskrav, detta gjordes för att främja alternativa lösningar och teknisk utveckling. Gångavståndskraven flyttades från BBR till rapporten 1994:10 Utrymningsdimensionering sedan Utrymningsdimensionering 2004 och sist till Utrymningsdimensionering 2006 innan de togs tillbaka in till BBR 19. Det var alltså till BBR 19 som kraven återinfördes i BBR. Anledningen till detta var att det skulle bli enklare för användaren. Målet med BBR 19 var att öka verifiering utav brandskyddet i byggnaderna. Det rådde tidigare stor variation utav säkerhetsnivån då Boverket inte reglerat detta tillräckligt. Konkurrens mellan företagen kunde uppstå då företagen kunde tolka reglerna olika. En följd utav detta blev att det blev svårare för branschen att kunna göra alternativa lösningar, t.ex. längre gångavstånd då det i BBR 19 var tydligare gränser för vad som var acceptabelt och inte. Detta ledde till irritation inom vissa delar utav branschen då utrymmet för diskussion med kommunerna kring ett för långt gångavstånd blev mindre. I BBR 20 är kraven desamma som i BBR 19 och snart kommer även BBR 21 att släppas och även där är kravnivån densamma. I våra grannländer Finland och Norge används ett liknande system. I Finland använder man inte verksamhetsklasser utan skriver ut exempel på byggnader och vad de har för maximalt gångavstånd. Finland är medlem i EU och det kan därför tyckas att kraven för gångavstånd till utrymningsvägar borde överensstämma med Sverige men så är inte fallet. Det finns inget krav på att byggreglerna ska vara enhetliga inom EU även om det skulle underlätta arbeten utom landets gränser. Gångavstånden är t.ex. längre för samlingslokaler men kortare för industrilokaler. Detta beror på att de två länderna ser olika på olika typer utav risker. Norge delar in sina utrymmen i olika riskklasser där varje riskklass har ett maximalt gångavstånd till utrymningsvägar. Norge är inte medlem i EU och kraven för maximala gångavstånd är hårdare än Sveriges. Norges krav för bostäder är 30 m jämfört med Sveriges 45 m och Norges krav för industrier är 50 m mot Sveriges 60 m. Det sista landet som utreddes i detta arbete är Nya Zeeland. Regelverket i Nya Zeeland skiljer sig mycket mot de övriga. Regelverket delas in i två grenar, verification methods (VM) och acceptable solutions (AS). VM är en analytisk dimensionerings metod där brandskyddet dimensioneras genom att personen som dimensionerar brandskyddet går igenom 10 olika scenarion, när dessa har gåtts igenom och målen har uppfyllts ska byggnaden vara godkänd. AS är förenklad dimensionering, den delas in i AS 1-7, där varje nummer är en byggnadstyp. Gångavstånden skiljer sig kraftigt mot de Svenska då de är mycket längre. I Nya Zeeland kan byggherren välja vilka nivå på brandskyddet ett visst utrymme ska ha och får därefter olika långa gångavstånd. Grundkraven är generellt sett högre än de svenska och används den högsta klassen på brandskydd, t.ex. automatiskt brandlarm och sprinklers med rökdetektorer så är gångavstånden i vissa fall dubbelt så långa som de svenska. Sista delen i arbetet är beräkningar över gångavstånd och takhöjd kontra tid till kritisk nivå. Kritisk nivå kan uppstå på olika sätt i ett rum, t.ex. att brandgaslagrets höjd kommer till en viss nivå, att toxiciteten är för hög eller att värmestrålningen är för stark. Beräkningsexempel utfördes på två olika lokaler med olika gångavstånd, 30 och 45 m. Takhöjden höjdes sedan med en tredjedel i de båda lokalerna och tiden till kritisk nivå jämfördes sedan. Beräkningsexempel avslöjar att takhöjden och gångavstånden (byggnadens storlek) har stor inverkan på tiden till kritisk nivå. När takhöjden höjs eller gångavståndet förlängs så ökar lokalens volym och därmed får röken en större yta att sprida ut sig på. I förenklad dimensionering tar man inte hänsyn till takhöjden och blir ett gångavstånd för långt måste analytisk dimensionering användas. Beräkningarna visar just att en större byggnad som har ett längre gångavstånd eller en högre takhöjd är gynnsamt då tiden för en säker utrymning ökar. Det vore kanske lämpligt att införa en paragraf i förenklad dimensionering att alla utrymmen som har en viss takhöjd eller en takhöjd över standard kan tillgodogöra sig en tredjedels längre gångavstånd precis som man får göra om en sprinklerinstallation görs. Den specifika takhöjdsgränsen bör tas fram genom riktiga försök samt beräkningar. Detta är en av arbetets slutsatser. Nyckelord: gångavstånd, utrymning, branddimensionering, Boverket.
12

Utveckling av typhus inför EUs Nära-nollenergikrav 2021 : En undersökning om hur ett typhus kan anpassas inför Nära-Nollenergikrav som införs 2021

Katz, Filip January 2018 (has links)
With the EU's introduction of Near-zero energy requirements to be implemented in all member states by 2021, the construction sector faces a challenge in which all new building constructions are receiving tightened demands for energy conservation. In the latest edition of Boverkets Byggregler, Boverket, the Swedish National Board of Housing, has revised the energy conservation section as the first of two steps in the introduction of the Near-zero energy requirement in Sweden, where the method of calculating energy consumption is renewed and primary energy aspects are now being considered.   As it is not yet completed what the exact level of requirement for Near-zero energy is, this study applies the proposal for Swedish application of Near-zero energy requirements published by Boverket in 2015, which proposes, among other things, which primary energy factors to use for different energy carriers and use this in combination with the new method of calculating energy consumption according to the latest edition of Boverkets Byggregler.   In addition to investigating what Near-zero energy will mean, the study had as its main objective to investigate what measures can be taken to the model house, provided by Nordisk Boutveckling, to enable the building to meet the new requirements. The study was therefore designed as a parameter study, where various measures to improve the building's energy conservation were tested in the energy-calculation program VIP-Energy.   The result shows that the building, which is considered to be of a typical construction standard, is able to meet the requirement when it combines existing solar cells on the roof with a battery that can store the energy produced during the solar hours and then use this to provide the building with electricity for heating, real estate energy and for the production of tap water instead of allowing the electricity to be sold or used as household-electricity. The result also shows that installing better windows is an effective measure if the building is to meet the energy requirements with a certain margin of safety. It also turns out possible to meet the requirements by improving the building with a number of measures and using district heating as a heating method.
13

Nära-nollenergibyggnader : En fallstudie av ett flerbostadshus förutsättningar att klara Boverkets framtida krav

Andersson, Ellen January 2017 (has links)
In order to develop energy-efficient constructions all new buildings will be nearly-zero energy buildings by year 2021. A nearly-zero energy facility is a building with high energy performance and very low energy consumption, where the amount of energy that needs to be supplied to the building will largely originate from renewable sources that are often self-produced on site or nearby. On December 15, 2016 BFS 2016: 13 - BBR 24 was introduced with requirements for verification of the building's specific energy use. The new regulations for nearly-zero energy buildings will be introduced in two stages through BBR (A) and BBR (B). BBR (A) implies no aggravation of requirements, but introduces a new way of calculating the energy performance of the building measured in primary energy. Primary energy factors are introduced per energy carrier, where the energy carrier for electric heating receives a higher value then other energy carriers. A projected five-storey apartment building located in Sigtuna, Stockholm has been investigated and energy calculations and simulations have been carried out in the energy calculation program IDA Indoor Climate and Energy. Simulations have been carried out on a reference object, focusing on analyzing how the energy utilization of the building is affected by various actions. The measures investigated are energy supply and origin of this, changes in the building construction and technical systems. The result shows that with relatively small changes the required demands of close-zero energy buildings can be reached. Changes to the building construction through better exterior wall insulation, better U-values ​​of building constructions and increased efficiency of heat exchanger, make demands for near-zero energy buildings in BBR (B). With self-produced electricity via solar cells the primary energy for the building will be even lower. The hardest challenge comes for the electricity heated buildings which due to an increased primary energy factor, will get harder to meet the future requirements due to a higher demand level.
14

På spaning efter den goda staden : om konstruktioner av ideal och problem i svensk stadsbyggnadsdiskussion / In search of the good city : constructions of ideals and problems in Swedish urban planning discussion

Tunström, Moa January 2009 (has links)
In this dissertation constructions of contemporary urban ideals are in focus, starting from the understanding that they are constructed in relation to both an idea of an urban renaissance and one ofa dissolving, or sprawling, city. The aim of the dissertation is to investigate and analyse how the city and the urban are discursively constructed in contemporary Swedish urban planning discussion. This is done by analysing articles from the Swedish Journal of Planning (Plan) and publications from the National Board of Housing, Building and Planning (Boverket) and the Urban Environment Council (Stadsmiljörådet). The main research topics are: How is the city and its history constructed? What norms are constructed about the city and the urban? How is planning and the role of the planner constructed, and what kind of knowledge and practices are emphasised? Methodologically, the dissertation is inspired by social constructivist methods, and mainly discourse theory. Applying this to the urban context means understanding urbanity and cities as constantly constructed and reconstructed discursively, even if both appear to be defined, absolute and recognisable. The analysis investigates these appearances and the meanings they are given – in this case in an urban planning context.  The analysis shows that history plays an important part in both the construction of ideals and problems. Both contemporary planning and the urban ideals are conceptualised in the light of a modernist planning era, which is emphasised as the period when the “real” city was dissolved or even destroyed. An “original”, pre-modern city is constructed and guarded as the norm, and the categorisation of places appear as important. Concepts both open and defined appear as central, such as diversity, variation, identity and urbanity. The planning practice that supposedly creates the good city is ideally a sensitive and emotional practice and practitioner, in line with communicative planning theory. Binary conceptual couples structure the discourse to a high degree, resulting in polarisations such as compact/sparse, city/countryside or inner city/suburb. The problematic or contradictory, such as the suburb, is marked off from the “real” city, and an inside and outside of the good city is created. The importance of a holistic and comprehensive planning perspective is emphasized, but at the same time the urban ideal that comes out appear as a strongly normative outlook from the traditional inner city. An inner city “we” is constructed, and the suburb, the suburban and its inhabitants are seen as an Other.  The dissertation also discusses some openings and contrary voices in the discourse and in other urban research indicative of an attempt to move beyond the polarisations. By questioning hierarchies and polarisations, and opening up for influence from outside of the discourse, concepts such as diversity and urbanity could be given alternative meanings instead of being used to mourn the loss of a “real”, original city or urban public space.
15

Optimerad tillbyggnad av befintligt studentboende : En studie av lönsam tillbyggnad som kan berättiga till statligt stöd / Optimized supplement building for student housing

Björk, Rebecka, Dahlbom, Caroline January 2021 (has links)
The aim with this thesis work is to examine a supplement building that fulfils the requirement forthe Boverket subsidy stöd för hyresbostäder och bostäder för studerande (2020). A proposal ofthe design of the supplement building on top of the already existing building in Flogsta, Uppsalais created and a profitability analysis for Uppsalahem is made.The three issues examined in the project are: How should this supplement building optimally be designed to meet the demands fromUppsalahem, the subsidy and Swedish building regulations? Is it estimated profitable to fulfil the increased energy requirement in the subsidy? Is it assessed profitable for Uppsalahem to go through with the project? The Supplement building is designed after the recommendations from Swedish Buildingregulations and Suitable International Standards, the ultimate floor plan resulted in 27apartments for students with 18 studio apartments, 1 two-room apartment and 8 three-roomapartments. The energy use calculations proved that the increased energy requirements could not bereached for the project and an increased subsidy could not be obtained. The profitability analysis resulted in an approved profit margin for the project. The subsidywithout the energy bonus resulted in a total subsidy of 11,2 million kr and a profit of 4,8 %.
16

En väg till att minimera felaktigheter vid ansökan om bygglov : En jämförelse mellan olika kommuner avseende hur bygglovsprocessens första del kan förbättras genom bygglovshandläggare respektive sökande / Pathway to minimize errors in submitting building permit applications : A comparison between different municipalities regarding how the first part of the building permit process can be improved through building permit administrator and private individuals as applicants

Akpan, Dennis, Jasim, Khalid January 2022 (has links)
Att söka bygglov kan uppfattas som en komplicerad process för privatpersoner som inte är insatt i bygglovssökandet, därför har rapporten ett mål med att utföra en del undersökningar för att finna nya lösningar som kan implementeras och minska andelen icke kompletta ärenden. Denna rapport riktar sig också på bristerna i bygglovsprocessens första skede samt hur det går att åtgärda dem genom att till exempel identifiera problemen och därefter förbättra respektive del.Studien grundar sig på att gå in på detalj såsom de olika kommunikations tillvägagångssätt för respektive kommun. Vi kommer även att undersöka på ifall informationen som ges av kommuner är tillräckligt samt lättillgängligt för sökande.Skrivandeprocessen som har använts för att utföra denna fallstudie har byggts på kvantitativ forskningsmetod då vetenskapliga artiklar, litteraturstudie, enkätundersökning användes. Utöver detta ingick en kvalitativ forskningsmetod genom intervjuer via Teams med olika bygglovschefer och bygglovhandläggare från respektive kommun.Resultatet består av besvarade enkäter som delades ut till både bygglovssökande och bygglovhandläggare i respektive kommun som ingår i studien. Kommuner som ingår i studien är Karlstad, Eskilstuna och Surahammars kommun. De besvarade enkäterna har formulerats på ett sätt för att kunna redovisa data i olika figurer såsom diagram och tabeller, vilket i sin tur ger en tydlig bild över de oklarheter som uppstår vid ansökan.Utifrån arbetets resultat har det visat sig att det som var mest problematiskt för bygglovssökande var kontrollplanen. Det upplevdes som den svåraste handlingen att få tag på och skicka komplett. Åtgärd till det är att ge möjlighet för sökande att få en liknande komplett bygglovsansökan som de kan ladda ner ifrån kommunhemsida vilket kan användas som en jämförelse. En lagändring eller förtydligande ifrån Boverkets hemsida är också en lösning då alla tre kommuner har hämtat exakt information och även behövt göra tillägg med information, beskrivningar och exemplar.Förtydligande av exempelritningar samt hemsidan är också en lösning för att underlätta för sökande genom att göra innehållet mer lättförståeligt. En text på hemsidan som upplyser om att väntetiden blir kortare vid en korrekt bygglovsansökan var också en lösning och dessutom att förbättra kommunikationen mellan handläggare och sökanden så att det blir mer lättillgängligt att nås via e-post, telefon och även fysiska möten vid frågor.En annan lösning som ficks fram från resultatet var att en spalt med handläggarens kontaktuppgifter för att få direkt kontakt och på så sätt förbättra kommunikationen mellan sökande och handläggaren gällande oklarheter och frågor. / Applying for a building permit can be perceived as a complicated process for private individuals who are not familiar with building permit applications. Therefore, this study has the goal of reducing the proportion of incomplete applications through conducting some surveys to find innovative solutions that can be implemented. We also focus on the shortcomings in the first stage of the building permit process, as well as how they can be remedied by e.g., identifying problems and then improving each part. The study goes into detail on different communication approaches for each municipality. We also investigate whether the information provided by municipalities is easily accessible to applicants. In achieving the above stated goals, a quantitative research method where scientific articles, literature studies and questionnaires were used. In addition to this, qualitative research methods were included through team interviews, primarily with different building permit managers and building permit administrators for each municipality. The results consist of answered questionnaires that were distributed to both building permit applicants and building permit administrators in each municipality who have collaborated with them. The partners in the report have been Karlstad, Eskilstuna and Surahammar municipality. The responses have been formulated in a way to be able to present data in various figures such as diagrams and tables, which in turn give a clear picture of most of the ambiguities that arise in the application. Based on the results of the work, it has turned out that it was most problematic for building permit applicants regarding the control plan. It was perceived as the most difficult document to get hold of and send complete. A measure for this is to give applicants the opportunity to receive a similar complete building permit application that they can download from the municipal website, which can be used as a comparison. A change in the law or clarification from the National Board of Housing, Building and Planning's website is also a solution as all three municipalities have obtained exact information and needed to make additions with information, descriptions, and copies. Clarification of sample drawings and the website is also a solution to make it easier for applicants by making the content easier to understand. A text on the website stating that the waiting time will be shorter with a correct building permit application was also a solution and to improve communication between administrators and applicants so that it becomes more accessible to be reached via e-mail, telephone, and even physical meetings with questions. Another solution that emerged from the result was that a column with the administrator's contact information to get direct contact and thus improve the communication between the applicant and the administrator regarding ambiguities and questions.
17

Hantering av materialdokumentation under projekteringsskedet

Abou Absi, Nicole, Karakurt, Reyhan January 2019 (has links)
Denna studie riktar sig på att kartlägga hur materialdokumentation upprättas för att uppfyllaBoverkets krav gällande förslag till lag. Det undersöks även vilka brister företagen upplevermed materialdokumentation och informationshantering. Vidare undersöks om BIM kan vara enlösning till kommunikationsproblem och underlätta informationshantering. I arbetet har detfokuserats på materialdokumentationen endast under projekteringen.Utredningen i studien har verkställts med kvalitativa metoder, litteraturstudie och intervjuer.Data som samlas in med hjälp av intervjuer används som primära källor kring den aktuellastudien. Respondenterna till intervjustudien är aktörer av olika slag och som anses haerfarenheter med materialdokumentation.Resultatet av studien visa att materialdokumentationen upprättas mest under produktioneneftersom företagen köper det mesta materialet under det skedet. Det som görs underprojekteringen är att företagen mest överväger och planerar hur dokumentationen ska gå till.Det som eventuellt kan dokumenteras under projekteringen är sådana material som bestäms itidiga skeden. Det som brister när företagen ska dokumentera är att materialdatabaserna ochklassifikationssystemen upplevs komplexa och överarbetade, vilket leder till att det inte läggsmycket tid på det och även att det ibland undviks att upprättas. BIM visar sig vara en lösningtill kommunikationsproblem och underlätta informationshantering, men den utnyttjas inte tillsin fulla potential eftersom det är många som inte har datorvana och kunskaper inom BIM.Vilket leder till att även BIM oftast väljs bort. / This study aims to identify how materialdocumentation is prepared to meet the requirements of the Swedish National Board of Housing, Building and Planning. It also examines which flaws the companies experience with materialdocumentation and informationmanagement. Also, further investigations on BIM are done, to see if it can be a solution to the problems. This study focuses on the materialdocumentation, but only during the project planning.The study was conducted with qualitative methods, literature studies and interviews. Datacollected using interviews are used as primary sources. The respondents to the interviews are workers of various kinds and are considered to have enough experience of materialdocumentation.The result of the study has shown that the materialdocumentation is mostly used duringproduction, because the companies buy the most material during that stage.The companies lack knowledge when it comes to documenting and using the material databases. This is because the classification systems are experienced to be complex and overworked. BIM turns out to be a solution to the problems, but it isn’t used to its full potential. This is because there are many who don’t have computer experience and knowledge within BIM.
18

Byggregler för flerbostadshus : en studie av konsekvenser och möjligheter att skapa kvalitativa bostäder genom riktad problemlösning i byggprocessen

Bergqvist, Michaela January 2019 (has links)
The National Board of Housing, Building and Planning have been conducting housing needs assessments since 1995 (Boverket 2015). The latest assessment was conducted in 2015 and showed that 71,000 homes will need to be built annually by 2020. To be able to contribute to building more homes, Willhem AB is carrying out a project called ”Så bygger vi för alla”. As part of the work, this thesis will examine the building rules and how they can contribute to innovation. The purpose of this thesis is to investigate which rules, laws and norms we have to keep to in Sweden regarding housing construction. The aim of the work is to investigate whether the regulatory framework can create creativity amongst the players in the market. This thesis is limited to examining which laws, government policies and eventual municipal requirements that exist in Sweden. Therefore, industry rules, such as the AMA, and contracting regulations, such as AB and ABT, will not be taken into consideration. The survey is also limited to newly built multifamily houses only. Finally, the reference objects that are studied in the thesis will be in Sweden and be limited to being either construction-technical or plan-based innovative and have been recently executed. This thesis is based on the existing regulations and theories from previous studies. The data collected for this survey will be studied from a qualitative point of view. The survey aims to investigate a number of reference objects more thoroughly and conduct interviews with key people involved in the project, which means a qualitative approach is best suited. In 1987, Sweden received a new building legislation according to Örnhall (2017), which has resulted in a transition from specification requirements to functional requirements in order to increase the liberty in housing production. However, according to Örnhall (2017 the new legislation has contributed to a wider picture of the regulatory framework. The National Board of Housing, Building and Planning is the authority that has the overall responsibility for community planning, urban development, construction and housing (Nordstrand 2008). The most important laws and government policies that the social planning sector primarily have to obey are the Planning and Building Act (PBL), the Planning and Building Regulation (PBF) as well as and the Swedish National Board of Housing, Building and Planning (BBR) (Örnhall, Swedish Construction Service 2017a). The Planning and Building Act (SFS 2010:900), PBL, regulates the planning for land and water whilst the responsibility for maintaining the regulations lies with the municipalities. The purpose of PBL is to promote social development for long-term, equal, social and environmental sustainable development for today’s society and future generations (SFS 2010: 900). When creating new homes, special consideration should be given to long term use of the home (Boverket 2016). At the interview stage, six areas emerged that were considered to be particularly problematic or interesting for the development of innovative and cheap housing. These areas were; accessibility, municipal requirements, rules, advice and interpretations, energy, innovation and development, and the ability to build for everyone. I perceived the accessibility aspect as very complex. Several interviewees argue that the accessibility requirements entail an increased cost for new builds, in one case it was even expressed that today’s availability requirements means the housing becomes less accessible to a larger group. The rules for creating an inclusive society also emerged at the interview stage while another recurring opinion is the renewal of the legislation. Several interviewees stated that they consider the regulations to be outdated and need to be updated according to today’s society. Based on this, I found The National Board of Housing, Building and Planning requirements contradictory whilst providing support for innovation, many requirements inhibits the development of housing. Therefore, extensive research should be carried out on how people in Sweden want to live today; thereafter the regulations can be updated according to today’s needs. In one way or another, all reference objects have been at the forefront when it comes to housing development. A common factor for the various reference objects is that a major problem was identified in all projects, which led to a product or solution being developed. They show that there is not one solution to the problem, but that different solutions can be found to achieve the same goal: better housing for more people.
19

Concrete Guidance? : An empirical study examining attitudes in regard to The Act of Climate declarations and its influence on the construction industry.

Hildebrandsson, Sammy, Anna, Olsson January 2022 (has links)
The construction industry is one of Sweden's largest industry emitters, an industry operating in the centre of cities worldwide, day and night. In order to achieve a more sustainable future and reduce greenhouse gas emissions, the construction industry must be less pollutive. On 1 of January 2022, the Swedish government implemented new regulation, The Act of Climate Declarations, within the construction industry, to enhance the knowledge of the climate impact of new buildings. The purpose of this study is to examine the implementation process of said regulation, its implications on concerned industry actors, and to investigate whether current restrictions would benefit from more strict policies or not. In this study, Institutional theory has been applied to analyse conducted empirical data to examine how the regulation has influenced different actors behaviours and practises. The result shows that the regulation has been widely accepted within the industry. Furthermore, this study shows that barriers are mainly found regarding the narrow scope the regulations require. Opportunities in regards are that actors are hopeful that the regulations could be a first step toward a more sustainable industry at large. These findings have added evidence that adds to current literature on future sustainability investments, such as limit-values and new proposals communicated by the Swedish Government while this thesis was written.
20

KRAVBILD FÖR AUTOMATISK SLÄCKSYSTEM -SPRINKLER / REQUIERMENTS FOR AUTOMATIC SPRINKLER SYSTEM

Yau, Candy January 2017 (has links)
Myndighetskraven som ställs på tekniska egenskaper vid uppförande av byggnader uppdaterasårligen och blir alltmer skarpare. I Boverkets byggregler 19 infördes automatiskt släcksystem somföreskriftskrav. Tidigare tillämpades de endast under allmänna råd. Syftet med denna rapport är attidentifiera kravbilden för installation av sprinkleranläggning i byggnader i Sverige, främst urmyndighetsperspektiv genom litteraturstudie samt informationsinsamling via intervjuer med diverseerfarna nyckelpersoner med olika bakgrund inom branschen.Kravbilden för installation av sprinkler styrs redan från riksdagsnivån via Plan- och bygglagen. Kravenförtydligas och specificeras mer detaljerat för varje instans fram till Svensk standard där reglernafinjusterats in i detaljer som bland annat aktiveringstid, tryck och vattentäthet. Reglerna ärdimensionerande och anpassad för olika typer av verksamheter samt områden.Myndighetskrav reglerar krav för installation av sprinkler i vissa vård- och omsorgslokaler medanförsäkringsbolagen reglerar villkor för installation av sprinkler i bland annat industrilokaler. Slutsatsenför rapporten är att kravbilden för installation av sprinklersystem skiljer sig mellan myndighetskravoch villkor enligt försäkringsbolagen. Myndighetskraven identifierar risker för människans liv ochhälsa och tar inte hänsyn till egendomsskydd, vilket försäkringsbolagen gör.I denna rapport kartläggs kravbilden för installation av sprinkler utifrån samhället krav från Plan- ochbygglagen till tidigare RUS 120 för att ge en inblick i hur juridiken inverkar på tekniken inombyggbranschen. / For every year, the authority requirements regarding building technology gets more acute andintense. In Boverkets byggregler 19 automatic sprinkler system changed from advice to requirement.Purpose of this report is to identify pretension for installation of automatic sprinkler system inbuildings in Sweden with focus in authority requirements through literatures and interviews.Requirements for installation of automatic sprinkler system are controlled by the parliament byPlanning and Building Act. The requirements clarify and gets clearer for every authority all the way toSvensk standard where the requirements adjust into details and regulates terms like response time,pressure and design density. The requirements are dimensional and customized for different activityand section.Authority requirements settles the pretension for installation of automatic sprinkler system in somebuildings for care in the same time insurance companies settles the pretension for installation ofautomatic sprinkler system in industry buildings. Conclusion for this report is that requirements forinstallation of automatic sprinkler system are different depends on if authority or insurancecompanies settles them. Requirements from authority focus in protection of lives while insurancecompanies focus in property loss. Boverket wants insurance companies to be more responsible foruse of automatic sprinkler system in other buildings than buildings for care.Different requirements from different parts of the society specifies in this report just to let thereader have an insight how jurisprudence affects technology in building industry.

Page generated in 0.4762 seconds