• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 51
  • Tagged with
  • 51
  • 13
  • 12
  • 7
  • 6
  • 6
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

ÄTA-arbeten - särskilt om entreprenörens rätt till tidsförlängning till följd av ÄTA-arbeten / Correctional and Additional Work (CAW) - The entrepreneurs right to prolongation due to CAW

Nyfors, Axel January 2020 (has links)
No description available.
42

Konsekvensen av sena ändringar i byggproduktionen : En utredning av ändrings-PM under produktionen / The consequences of late changes in the production of a building : An investigation of revision memos during the production

Iveros, Madelene, Linde, Åsa January 2019 (has links)
This thesis project examines changes to building documents during the product development in the construction process, which is referred as revision memos in this report. The study is made in cooperation with Serneke and is therefore limited to project within this company. Furthermore, the information in this study is based on relevant literature as well as interviews, a poll and material from three of Serneke´s projects. The results show that the examined projects have exceeded the estimated design cost due to changes made during production. By investigating the revision memos, the conclusion was that performing construction, commercial projects and rebuilding projects generate more revision memos as well as the architect and constructor had the greatest number and most expensive revision memos. It also appears that the number of revision memos of other disciplines varies between projects. Furthermore, the design process seems to generate many mistakes that appear in the production, which means that an improved design process with experience feedback and collision control should detect mistakes at an earlier stage. Recommendation for future projects is to make use of the contractors knowledge of production early in the design stage, to use experience feedback and collision control, to introduce a date for last additions, to use Swedish standard when establishing revision memos and to not execute changes before a revision memo is published. In conclusion of this project follows a few recommendations for continued investigation of this field of study. / Detta arbete undersöker ändringar av handlingar som sker vid produktframtagningen i byggprocessen, vilket benämns ändrings-PM i denna rapport. Syftet är att kartlägga problematiken kring ändrings- och tilläggsarbeten i ett sent skede och målet är att öka medvetenheten gällande ändrings-PM och dess konsekvenser. Arbetet genomförs under 10 veckor och begränsas därför till att undersöka projekt inom Serneke. Vidare kommer olika entreprenadformer och olika projekttyper att jämföras detta då de olika förutsättningarna i projekten förväntas generera olika mängder ändrings-PM. Metoden för detta arbete är dels en litteraturstudie, som förklarar olika begrepp och tillvägagångssätt, samt intervjuer och enkät som kompletteras med underlag från tre av Sernekes projekt. I resultatet framgår det att de undersökta projektens bedömda projekterings-kostnad överstigits på grund av ändringar som skett under produktionen. Sammanställningen av ändrings-PM från projekten samt enkätsvaren visar också att arkitekten och konstruktören har flest antal samt dyrast ändrings-PM. Vidare framgår det att övriga discipliners ändrings-PM varierar i antal mellan projekt. Vad gäller entreprenadform och projekttyp framgick det av enkäten och intervjuerna att utförandeentreprenader, kommersiella projekt och ROT-projekt rimligtvis genererar mer ändrings-PM dock kunde detta inte stärkas av något ytterligare material. Däremot kunde kommunikationsverktyget Byggnet undersökas med slutsatsen att det är ett väl fungerande informationssystem vid korrekt användning. Vidare anses projekteringen generera många fel som dyker upp i produktionen, vilket medför att en förbättrad projektering med erfarenhetsåterföring och kollisionskontroll borde upptäcka misstag i ett tidigare skede. För framtida projekt rekommenderas att nyttja entreprenörens erfarenhet av produktionen i projekteringen, att använda sig av erfarenhetsåterföring och kollisionskontroll, att införa ett datum för sista tillägg, att använda svensk standard vid upprättande av ändrings-PM samt att utföra ändringar efter ett publicerat ändrings-PM. Genom att vidare undersöka flera projekt med olika entreprenadformer och projekttyper skulle en kartläggning kunde göras för antalet ändrings-PM och hur de påverkar projektets kostnad och tidplan.
43

Varför förändras institutioner? : – Kommunal barnomsorg på entreprenad / Why do institutions change? : - The case of private contracts in public childcare

Nilsson, Per January 2007 (has links)
Denna uppsats behandlar politisk förändring i svenska kommuner. Fokus är New Public Management-reformer och specifikt har andelen kommunal barnomsorg på entreprenad studerats. Studien är kvantitativ och består av datamaterial över Sveriges 290 kommuner som samlats av Statistiska Centralbyrån (SCB) under perioden 1998-2005. Teoretiskt utgår uppsatsen från en nyinstitutionell teori. Fyra hypoteser om politisk förändring i svenska kommuner har konstruerats och sedan operationaliserats genom sex variabler; politisk majoritet (blå/röd), kommunstorlek, skatteunderlag och andel barn- och äldreomsorg på entreprenad. Dessa har sedan analyserats genom en regressionsanalys och slutsatsen är att ideologi som variabel inte inverkar på en kommuns reformbenägenhet, utan visar främst att stigberoende, isomorphism och kommuners ekonomiska situation är avgörande för kommuner ska välja att lägga ut barnomsorg på entreprenad.
44

En första stomresning i KL-trä : En analys av ett entreprenadföretags erfarenheter från sitt första projekt med KL-trästomme / A first mounting of a CLT-frame : An analysis of a contractor’s experience from their first project with a CLT frame

Funck, Olle, Ek, Olle January 2021 (has links)
Syfte:  Produktionsvolymen av KL-trä har de senaste åren ökat i Sverige, vilket ligger till grund för ett ökat kunskapsbehov hos entreprenörer. Ett svenskt entreprenadföretag genomför våren 2021 sitt första projekt med KL-trästomme. Studiens mål är därför att identifiera nyckelfaktorer och förbättringsmöjligheter för ett entreprenadföretags första monteringsprocess i KL-trä. Genom det ska studien bidra till ökade kunskaper för framtida projekt i KL-trä. Metod: Studien är en fallstudie med litteraturstudier, intervjuer och observationer av ett referensprojekt. Litteraturstudier av befintlig forskning ger en förklaringsansats för erhållen empiri från intervjuer och observationer. Erhållen empiri analyseras tematiskt utifrån förklaringsansatsen och studiens frågeställningar. Resultat:  Studien visar främst på sju nyckelfaktorer och förbättringsmöjligheter vilka av studien anses relevanta att beakta vid en monteringsprocess i KL-trä. Dessa punkter är platstillverkade innerväggar, erfarenhetsåterföring, infästning, monteringsledare, personal, projektering och väderskydd. Konsekvenser:  Med hjälp av genomförd studie ska entreprenadföretag vilka genomför sina första totalentreprenader med KL-trästomme kunna ta lärdom från referensprojektets monteringsprocess. Studiens mål är att erhållna erfarenheter ska ge företag bättre förutsättningar inför framtida projekt i KL-trä. Vidare rekommenderas fler studier inom ämnet för ökade kunskaper för entreprenörer kring monteringsprocessen i KL-trä. Begränsningar:  Slutsatser och resultat rör främst totalentreprenörer vid byggnation av KL-trästomme liknande studiens referensprojekt. Eftersom studien endast rör ett referensprojekt med åtta respondenter anses resultatet inte generaliserbart. I syfte att åstadkomma ett generaliserbart resultat bör fler liknande studier i samarbete med andra företag genomföras. / Purpose:  Sweden’s production of cross laminated timber (CLT) has increased over the recent years which creates a demand of knowledge for contractors. A Swedish contactor implement their first project with a CLT-frame the spring of 2021. This study strives to identify key factors and improvements for a contractors first mounting process with CLT. Through this strives the study to contribute to increased knowledge for future projects with CLT. Method:  The study is a case-study with interviews and observations of a reference project. Document studies of existing science provides an explanatory approach for collected empirical data from interviews and observations. Collected empirical data is thematical analyzed based on the explanatory approach and the studies issues. Findings:  This study concludes mainly seven key factors and improvements who is considered relevant when implementing a mounting process with CLT. These findings are on-site manufactured indoor walls, experience feedback, fastener, mounting conductor, staff, design, and weather protection. Implications:  With this study, contractors who implement their first design and& build contracts with a CLT-frame could learn from the mounting process of the reference project. The aim of this study is that gained experiences provides contractors better prerequisites before future CLT-projects. Complementary studies regarding the subject are recommended for contractors increased knowledge of the mounting process with CLT. Limitations:  Conclusions and results from this study mainly concerns design and& build contractors mounting a CLT-frame similar with the reference project. Since the study solely concern one reference project with eight respondents, the result is not considered generalizable. To gain a generalizable result, more studies similar with this and in corporation with other companies could be done.
45

Mindre konsultföretags etablering i den privata byggsektorn

Hägglund, Jonathan, Toumeh, Salwa January 2021 (has links)
Extensive construction projects are often complicated and unique. It is, therefore, essential that the right competence participate to ensure all steps in the construction process are done the right way. This competence is often not sufficient for the participants who are interested in the construction of the building. Both the contractor and the developer, therefore, need to hire external consultants, who specialize in the area where additional knowledge is needed. Thus, the consultants' work in the construction industry fulfills an important function during the construction process. Therefore, it is in high interest, to ensure that the right consultant is chosen for the right assignment. This bachelor thesis only takes into account the relationship between entrepreneurs and consultants. The construction industry is, in many cases, traditional, and contractors often choose to hire consultants they have been happy with from previous projects, even though, they may not be the optimal choice for a project. This can mean, the contractor, who chooses to go the safe route miss out on innovative solutions other consultants may bring to the table, which results in slow industry development. The purpose of this thesis is to investigate how less established consulting companies, only with experience from public procurement, should proceed to become more sought after among contractors for private construction projects. To achieve a clearer picture of the situation, the advantages and disadvantages are compared with public and private procurement, respectively. It is further investigated what entrepreneurs want consultants to focus on for optimal collaborations. The results are based on interviews with respondents whose roles involve consulting purchases among the largest construction contractors in Sweden. The interviews were conducted with a total of nine respondents. The results from the interview study show that contractors see some recurring problems among consulting procurement. The contractors mainly wish the consultants could keep schedules better and be more controllable to reach the goal faster, which is often challenging to put concretely. The entrepreneurs' recommendations to smaller consulting firms were to focus on the skills they are best at and to present their organization and previous references in a professional way, whether they are from public or private assignments.
46

Bibliotekspersonal på entreprenad : Institutionella logiker bakom Stockholms stadsbiblioteks användning av bemanningsföretag i personalförsörjningen / Outsourced library staff : Institutional logics behind The City of Stockholm public libraries use of temporary employment agencies

Ringbom, Olivia January 2023 (has links)
Introduction. This thesis intends to examine and problematize a phenomenon that, until now, has not been the subject of research: the use of temporary employment agencies in Swedish public libraries. The aim of the study is to investigate how the motives for using temporary employed library staff can be understood in relation to two potentially conflicting institutional logics: the market-liberal oriented New Public Management (NPM) logic and the professional library logic. Furthermore, the study aims to examine how these two logics are used as a means of obtaining legitimacy. Theory & Method. The theoretical underpinnings of the study are new institutional theory, and the research method is document analysis. The study’s empirical material consists of public documents, which have been processed through a qualitative thematic content analysis. By focusing on one specific organization - The City of Stockholm public libraries (Stockholms stadsbibliotek) - the investigation is carried out as a case-study. Results & Analysis. Six main themes have been identified: resource efficiency, flexibility, open libraries, competence, stability and administration. All themes contain expressions of both institutional logics. Legitimacy is obtained partly through the NPM logic and in relation to cost efficiency, partly in relation to the professional and democratic principles of the library logic. Thus, both logics are applied to justify the use of temporary employment agencies. Conclusion. The studied documents contain a relatively stable dynamic between the NPM logic and the library logic. Contrary to what some new institutional theorists have argued, the study’s results indicate that multiple logics may be able to coexist within an organizational field. The explanation for the coexistence of these logics might be that they share certain aspirations and perceptions, for example the perception of the library users and administrative work.   This is a two years master’s thesis in Library and Information Science.
47

Likställda arbeten i entreprenader

Widmark, Ronnie January 2020 (has links)
Vid entreprenader förekommer ett begrepp som kallas ÄTA (Ändringsarbete, Tilläggsarbete och Avgående arbete). Ett ÄTA-arbete uppstår när beställaren under entreprenadtidens gång föreskriver något som inte är angivet i kontraktshandlingarna. ÄTA är dessutom beställarens garanti för att dennes önskemål med investeringen blir som det är tänkt. Entreprenören är vid sådana tillfällen både berättigad och skyldig att utföra dessa ÄTA-arbeten mot ersättning. Detta står att läsa i standardavtalen AB 04 och ABT 06 som entreprenadavtalen ofta grundas på.1 När det kommer till entreprenörens rätt att erhålla betalning för arbeten som denne anser inte ingår i kontraktsarbetena kallas det för ”arbeten likställda med ÄTA-arbeten” (vidare kallat likställda arbeten). Den bestämmelsen återfinns i 2:4 i standardavtalen.  Regleringen gällande likställda arbeten verkar till synes väldigt genomtänkt och belyst av upphovsmännen i föreningen Byggandets kontraktskommité (BKK). Det har dock visat sig att den bestämmelse som skapats för att råda bot på eventuella problem när verkligheten avviker från det förmodade, inte sällan vållar meningsskiljaktigheter mellan parterna. Samtidigt som entreprenören vill ha extra betalt för arbeten som inte står med i kontraktet, så ligger det i beställarens intresse att betala så lite som möjligt utöver kontraktssumman. En fråga som väckt min nyfikenhet är hur en tvist om betalning för likställda arbeten kan bli så omfattande och handla om ett belopp om 21 miljoner kronor som i NJA 2015 s. 3.2 Informerade entreprenören inte beställaren om att de ansåg att det förelåg ett likställt arbete? Inhämtade entreprenören beställarens synpunkter, som i sin tur förklarade att de var av en annan åsikt? I händelse av det senare, varför fortsatte entreprenören att utföra likställda arbeten vid äventyr av att inte erhålla betalning? Eller har entreprenören inhämtat beställarens synpunkter utan att erhålla ett positivt svar av beställaren men valt att fortsätta ändå för att senare tvista om saken?  Hade det inte varit en mindre riskabel lösning för entreprenören att häva kontraktet i stället för att riskera att arbeta utan att erhålla betalning? Det känns i sammanhanget som att entreprenören står för en större del av riskerna när det kommer till de likställda arbetena och kostnaderna som uppstår. Under den senaste 15-årsperioden då AB 04 och ABT 06 varit gällande har BKK genom de nu gällande standardavtalen, och Högsta domstolen (HD) med sina prejudicerande domar, fastställt hur de grundläggande begreppen och rekvisiten ska tolkas när det gäller regeln om likställda arbeten i 2:4 och framförallt frågor om hur de här aktuella bestämmelserna i kapitel 2 i standardavtalen ska tolkas.  Uppsatsen handlar således om likställda arbeten och problematiken kring det begreppet.
48

Arbetsmiljöansvar vid uthyrning av arbetskraft kontra entreprenad

Hansson, Sandra January 2013 (has links)
Bemanningsföretagen har sedan legaliseringen 1993 fått fäste på den svenska arbetsmarknaden. Bemanningsbranschen innebär en förändring av det traditionella anställningsförhållandet som vanligtvis är tvåpartsrelation till att bli en trepartsrelation. Det har skapat viss problematik, då arbetsrättslig lagstiftning främst är anpassad efter den tvåpartsrelation som ännu anses vanligast. Den reglering som styr arbetsmiljöfrågor är främst Arbetsmiljölagen, vilken kom till då trepartsförhållande var främmande för den svenska arbetsmarknaden. Därmed väcktes frågan om vilken aktör som bär arbetsmiljöansvaret vid uthyrning av arbetskraft samt om arbetsmiljöansvaret skiljer sig vid anlitandet av entreprenad.Syftet blir därför att, genom den rättsdogmatiska metoden, utreda gällande rätt och därigenom få djupare förståelse för komplexiteten kring ämnet. Stora delar av uppsatsen är av deskriptiv karaktär, en beskrivning av rådande rättsläge. För att få en internationell koppling berörs även International Labour Organizations konvention nr. 181 i syfte att utreda vilken inverkan den har för arbetstagare som hyrs ut av bemanningsföretag och deras arbetsmiljö.I mina slutsatser konstaterar jag att skyddet för den”traditionella arbetstagaren” är omfattande, medan skyddet för en arbetstagare i en trepartsrelation är betydligt mer komplex. Arbetsmiljöansvaret vid uthyrning av arbetstagare är i behov av ett förtydligande, vilket enligt mig borde ske genom lagstiftning. Till skillnad från personaluthyrning råder det ingen tvekan om ansvarsfördelningen vid anlitandet av entreprenad i Arbetsmiljölagen men enligt mig finns det ett behov av en definition av begreppet entreprenad. Definitionen bör syfta till att förebygga feltolkning av begreppet, då arbetssituationen, i vissa fall, kan bidra till att ett annat rättsförhållande skapas och att arbetsmiljöansvar då förskjuts till kundföretaget. International Labour Organizations konvention nr. 181 har ingen direkt inverkan på arbetsmiljöansvaret för uthyrda arbetstagare, då Sverige valt att inte ratificera konventionen. / Recruitment companies have since legalization in 1993 gained a foothold on the Swedish labour market. The staffing industry is a change from the traditional employment relationship which usually is a bilateral relationship to become a trilateral relationship. This has created some problems, when labour legislation primarily is adapted to the bilateral relationship, which still is considered most common. The regulations governing health and safety issues at the working place are mainly found in the Work Environment Act, which was written before the trilateral relationship appeared on the Swedish labour market. Thus, the question arose as to which player has the safety responsibility for rented labour and if the work environment responsibility differs in the employment of subcontracted employees.The aim of this thesis is therefore, through the legal dogmatic method, to investigate the law and thereby gain a deeper understanding of the complexity of the subject. A large section of my paper is of descriptive character, a description of the current legal position. To get an international connection, I also refer to the International Labour Organization Convention 181 in order to investigate what impact it has on rented labour and the work environment.In my findings, I conclude that the protection of the "traditional worker" is extensive while the protection of a worker in a trilateral relationship is much more complex. Work environment responsibility for hiring of workers is in need of clarification, which according to me, should be by legislation. Apart from rented labour, there are no uncertainties regarding work environment responsibilities for subcontracted employees in the Working Environment Act. However, according to me, there is a need of a definition of the term outsourcing. The definition should aim to prevent misinterpretation of the concept. In some cases the work conditions can contribute to the fact that a different legal relationship is created and work environment responsibilities are shifted to the client company. International Labour Organization Convention 181 has no direct impact on the work environment responsibility for rented labour since Sweden decided not to ratify the Convention.
49

Ändring av avtalat pris i entreprenader : Om tolkningen av kap 6 § 3 i AB 04 och ABT 06 / Changes to the agreed price in construction contracts : On the interpretation of chapter 6 article 3 in the general provisions on the construction contracts

Yttermyr, Cornelia January 2023 (has links)
No description available.
50

EN FALLSTUDIE OM MÖJLIGHETERNA ATT MINSKA KLIMATAVTRYCKET FRÅN VA-ENTREPRENADER / A CASE STUDY ABOUT THE POSSIBILITIES TO REDUCE THE CLIMATE FOOTPRINT FROM WATER- AND SEWER ENTERPRISERS

Fransson, Sarah, Lagerroth, Stina January 2023 (has links)
Introduktion (och mål) - I dagens samhälle är klimatet en viktig fråga och bygg- och anläggningssektorn står för stora mängder koldioxidutsläpp. Denna forskning syftar till att studera hur klimatavtrycket från VA-entreprenader kan minskas. Metod – För att genomföra studien har en VA-entreprenad, utförd av Skanska, studerats genom en fallstudie. I studien har data samlats in genom interna dokument och intervjuer. Resultat – Dokumenten visar att lokal masshantering och användning av HVO som bränsle i stället för diesel ger minskade koldioxidutsläpp i projektet och intervjuerna bekräftar detta. I intervjuerna nämns också att grön asfalt används för att minska koldioxidutsläppen. Möjligheterna för att minska klimatavtrycket i framtiden som tas upp är bland annat eldrivna grävmaskiner och transporter samt biobindemedel i asfalten. De hinder som intervjupersonerna nämner för att minska klimatavtrycket är bland annat brist på miljövänligt VA-material i plast, laddning av eldrivna maskiner och den extra kostnaden det blir för att arbeta miljövänligt. Analys – De klimatanpassningar som redan görs ses som relativt enkla tekniker medan möjligheterna för att i framtiden minska utsläppen just nu hindras av kostanden och att vissa tekniker inte är tillräckligt utvecklade. Diskussion – I studien framgår att användning av HVO och grön asfalt är åtgärder för att minska koldioxidutsläppen och att dessa stärks av tidigare forskning. Lokalmasshantering är också en åtgärd för att minska koldioxidutsläppen men konstateras vara svår att koppla till tidigare studier. Möjligheterna med att minska utsläppen genom eldrivna grävmaskiner och transporter bekräftas genom tidigare forskning vilket också användningen av biobindemedel i stället för bitumen i asfalten gör. Bristen på miljövänliga VA-material i plast bekräftas i tidigare studier vilket också merkostnaden för HVO i jämförelse med diesel gör. / Introduction (and aim) – In today's society, the climate is an important issue and the building and construction sector accounts for large amounts of carbon dioxide emissions. This research aims to study how the climate footprint from water and sewer contracts can be reduced. Method – To accomplish the study, a water and sewer contract carried out by Skanska has been studied through a case study. In the study data has been collected through internal documents and interviews. Results – The documents show that “local mass handling” and the use of HVO as fuel instead of diesel, generates reduced carbon dioxide emissions in the project and the interviews confirm the information. Also mentioned in the interviews is that green asphalt is used to reduce carbon dioxide emissions. Possibilities for reducing the climate footprint in the future that are brought up include electric-powered excavators and transport as well as bio-binders in the asphalt. The obstacles that are mentioned in the interviews to reduce the climate footprint are, among other things, lack of environmentally friendly plastic materials for water and sewer enterprisers, charging of electric machines and the extra cost of working in an environmentally friendly way. Analysis – The climate adaptations that are used today is seen as relatively simple technologies, while the possibilities for reducing emissions in the future are currently stopped by the increased cost and that certain technologies are not developed sufficiently. Discussion – The study shows that the use of HVO and green asphalt are ways to reduce carbon dioxide emissions and that these are supported by previous research. Local mass handling is also a way to reduce carbon dioxide emissions but has been difficult to confirm by previous studies. The possibilities of reducing emissions through electric excavators and transports are confirmed by previous research, and the use of bio-binders instead of bitumen in the asphalt is also confirmed. The lack of environmentally friendly plastic material for water and sewer enterprisers is confirmed in previous studies, also the additional cost of HVO compared to diesel is confirmed.

Page generated in 0.1308 seconds