• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 84
  • 20
  • Tagged with
  • 104
  • 44
  • 40
  • 19
  • 17
  • 14
  • 13
  • 12
  • 11
  • 11
  • 11
  • 10
  • 10
  • 10
  • 9
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
71

Utveckling av temporär kulturutsällning / Development of temporary colture exhibition

Rundqvist, Jonatan January 2014 (has links)
Den här rapporten utgör dokumentationen av ett examensarbete som genomfördes inom Kandidatpåbyggnadslinjen vid Jönköpings tekniska högskola. Inom det jubileumsår som Nässjö stad firar i samband med stadens 100-årsdag var det Nässjö Järnvägsmuseums mål att ta fram en temporär kulturutställning i en tågvagn, vilken ska stå vid Nässjö tågstation under jubileumsårets gång. Genom projektledare hos Nässjö kommun kom museet i kontakt med en designstudent från Jönköpings tekniska högskola, vilken erhöll uppgiften att utveckla den temporära kulturutställningen. Syftet med projektet var att undersöka hur en temporär kulturutställning kan se ut för att locka till sig besökare och intresse från önskade målgrupper. För att konkretisera syftet konkritiserades de till en frågeställning som handlade om hur temporära kulturutställningar och deras grafiska kommunikation kan te sig för att locka till sig önskade målgrupper. Därtill togs fyra konkreta målsättningar fram, vilka specificerade att projektet ska leda till designen av en utställning, tillhörande grafisk kommunikation, skyltning för Nässjö järnvägsmuseum samt ett kompendie där den grafiska kommunikationen visades upp. För att exemplifiera hur en temporär kulturutställning kan te sig och infria målsättningarna inleddes arbetet med undersökningar observationer och intervjuer vid olika kulturutställningar. Därtill genomfördes även observationer och intervjuer för att ta reda på Nässjö järnvägsmuseums förutsättningar för dess utställningar. Innan designarbetet tog sin början utfördes även kortare analyser av skyltning. Designarbetet fokuserades till en början mot att skapa gemensamma preferenser för alla olika element inom projektet, exempelvis moodboard, färgschema och val av typsnitt. Därefter fortsatte de olika beståndsdelarna att utvecklas parallellt, med fokus mot utställningen och den grafiska kommunikationen. Genom tydlig utgångspunkt i de behov och krav som specificerats i designbriefer och funktionsanalyser tog logotyp, poster och foldrar fram tillsammans med bilder och texter till utställningen. Resultatet tog form av visualiseringar över en luftig, ljus och modern utställning inuti en tågvagn. Visualiseringarna ackompanjerades av ett komplett material för grafisk kommunikation, vilken sammanställdes i ett lättöverskådligt kompendie, samt tre olika skyltutföranden till Nässjö järnvägsmuseums olika jubileumsutställningar / The present report is the documentation of a thesis which was conducted within the Bachelor Postgraduate program at Jönköping University of Technology. Within the anniversary year as Nässjö city celebrates during the city's 100th birthday it was Nässjö Railway Museum's goal is to develop a temporary cultural exhibition in a train carriage, which could be showed at Nässjö train station during the anniversary. Through a project manager at Nässjö the Museum came in contact with a design student from Jönköping University of Technology, who was appointed with the task of developing the temporary culture exhibition. The aim of the project was to investigate how a temporary culture exhibition might look to attract visitors and interest from the desired target audiences. To concretize the purpose it was developed into a question, which asked how temporary cultural exhibitions and their graphic communication might be designed to attract the desired target audiences. In addition four specific objectives were brought forward, which specified that the project would lead to the design of an exhibition, accompanying graphic communications, signage to Nässjö railway museum and a graphic manual where the graphic communication would be illustrated. To exemplify how a temporary exhibition culture may appear and fulfill the objectives, work began with investigations observations and interviews took place at various cultural exhibitions. In addition observations and interviews was conducted to find out Nässjö Railway Museum's conditions for its exhibitions. Before design work began analysis of different types of signage was also performed. Design work initially focused on creating shared preferences for all the different elements of the project, such as trough a mood board, a color scheme and a font selection. Continuing, the various components evolved parallel, with a focus on the exhibition and the graphic communication. By basing all designs on the needs and requirements specified within design briefs and functional analyzes a logo, poster and leaflets were produced along with pictures and lyrics for the exhibition. The result took the form of visualizations of an airy, bright and modern exhibition inside a train carriage. The rendered pictures were accompanied by complete material for graphic communications, which were compiled in an easily understandable graphic manual, and three different designs of signs to Nässjö Railway Museum's various commemorative exhibitions.
72

Vilka konsekvenser kan en järnvägsutredning få för tätortsutvecklingen? : En konsekvensanalys av utredningsområdet: Stationsläge Piteå

Jonsson, Peter January 2017 (has links)
Bakgrunden till denna studie är framdragningen av kustjärnvägen Norrbotniabanan mellan Umeå och Luleå med stationslägen i bland annat Skellefteå och Piteå. Järnvägen är en miljövänlig transportlösning för gods men också för persontransporter, som bidrar till att binda samman hela kustlandet. När nya infrastruktursatsningar ska genomföras föregås de av ingående utredningar. De ska klargöras när, var och hur satsningen ska genomföras och av vem. Finansieringen av projektet är också en viktig fråga, är det privata aktörer eller är det samhället som ska betala. Är det samhället som ska finansiera projektet är det av stor vikt att klargöra om effekterna av åtgärden är samhällsekonomiskt hållbara. Dessa infrastruktursatsningar blir ofta identifierade som riksintressen. Tolkningen av riksintressenas överlägsna ställning vid mark- och vattenanvändningsplanering gör att det infaller ett investeringsvakuum direkt Trafikverket identifierat ett infrastrukturprojekt som är av rikets intresse för kommunikationer. Syftet med denna studie är att utreda de konsekvenser som en framdragning av viktig infrastruktur som Norrbotniabanan har på tätortsutvecklingen under utredningsarbetet av projekten och svara på följande frågeställningar: <ol type="1">  Vad innebär järnvägsutredningar för tätortsutvecklingen före byggstarten av järnvägen? <ul type="disc"><ul type="disc">Vilka är de negativa konsekvenserna för den kommunala tätortsutvecklingen av utredningsarbetet? Vilka är de positiva konsekvenserna för den kommunala tätortsutvecklingen av utredningsarbetet? <ol type="1">Hur kan de negativa konsekvenserna av en järnvägsutredning minimeras? Hur kan de positiva konsekvenserna av en järnvägsutredning tillvartas? För att svara på frågeställningarna har en abduktiv ansats med kvalitativa metoder använts i denna studie. En systematisk litteraturstudie har kompletterats med semistrukturerade intervjuer. För att ytterligare fördjupa förståelsen har en Planstudie genomförts av Piteå kommuns översiktsplan samt påverkade detaljplaner. De viktigaste slutsatserna av denna studie är att utredningskorridoren för Norrbotniabanan har påverkat tätortsutvecklingen i Piteå kommun negativt. Hur stora de negativa konsekvenserna varit är svårt att konkretisera. De negativa konsekvenserna som framkommit av studien är bland annat: Skapar osäkerhet, med allt vad det innebär av uteblivna investeringar i verksamheter men också bostadsbyggande. Förbättringsåtgärder försvåras på befintliga anläggningar. Påverkar fastighetsmarknaden negativt då försäljningar uteblir. Skapar planeringssvårigheter, eftersom alternativa lägen ofta måste väljas. Påverkar tillgången på etableringsbar mark i kommunen. Verksamhetsmarken i kommunen är slut och önskvärda etableringslägen för bostäder i centrum påverkas. En positiv konsekvens av utredningsarbetet för Norrbotniabanan är att det planeras för en regionsammankopplande järnväg. / The background to this study is the development of the Norrbotniabanan coastal railway between Umeå and Luleå with including stations in Skellefteå and Piteå. The railroad is an environmentally friendly solution for goods but also for passenger transport, which helps to tie together the entire coastal region. When new infrastructure initiatives are to be implemented, they are preceded by in-depth investigations. It has to be clarified when and how the investment will be carried out and by whom. Financing the project is also an important issue, is it private actors or is the society going to pay. If the society is financing the project, it is important to clarify whether the impact of the measure is socio-economic. These infrastructure initiatives are often identified as national interests. The interpretation of the supreme position of national interest in land and water use planning makes it an investment vacuum area directly The Swedish Transport Administration (Trafikverket) has identified an infrastructure project that is of the public interest in communications. The purpose of this study is to investigate the impact of a project on important infrastructure like Norrbotniabanan has on urban development during the investigation of the project and answer the following questions. What do railway investigations mean for urban development before the construction of the railway? What are the negative consequences for the municipal urban development of the investigations? What are the positive consequences for the municipal urban development of the investigations? How can the negative impact of a railway investigation be minimized? How can the positive consequences of a railway investigation be improved? To answer the questions an abductive approach whit qualitative method has been used in this study. A systematic literature study has been supplemented with semi structured interviews. To further deepen the understanding, a Plane study has been conducted by Piteå municipality's overview plan and affected detailed plans. The main conclusions of this study are that the investigation corridor for Norrbotniabanan has negatively affected urban development in Piteå municipality. How big the negative consequences have been is difficult to concretize. The negative consequences identified by the study include: • Creates uncertainty, with all that it means of missing investments in businesses but also housing construction. Improvement measures are made difficult at existing facilities. Have effects on the property market in the municipality, due to missing house sales. • Creates planning difficulties, because alternative modes often have to be selected. Have effects on the availability of plannable land in the municipality. The industrial in the municipalities have ended and desirable establishments for housing in the center are affected. A positive consequence of the investigations work for the Norrbotniabanan railway is that it is planned for a regional connecting railway.
73

Riksgränsbanans elektrifiering : Stat och företag i samverkan: 1910-1917

Wiklund, Roine January 2012 (has links)
Syftet med föreliggande doktorsavhandling i teknikhistoria är att öka kunskapen om varför, men framförallt hur och under vilka villkor den första elektrifieringen av en statsägd järnväg genomfördes i Sverige. Arbetet med Riksgränsbanans elektrifiering pågick 1908-1917 och var på många sätt ett unikt pionjärprojekt. Två stora tekniska system skulle där komma att sammankopplas med varandra; artonhundratalets mogna järnvägssystem med nittonhundratalets nya elkraftsystem. Riksgränsbanan, den omkring 130 km långa nordligaste delen av Malmbanan mellan Kiruna och Riksgränsen, var världens dittills nordligaste järnväg att elektrifieras och det subarktiska klimatet ställde stora krav på utförandet av tekniska komponenter. Den geografiska lokaliseringen innebar dessutom att de långa avstånden till beslutsfattare inom statsförvaltning och företag måste hanteras. Därutöver genomfördes projektet i en tidsperiod präglad av protektionism, nationalism och internationella konflikter, yttre faktorer som alla också påverkade projektets utformning och genomförande. Att det var Riksgränsbanan som blev den första statliga järnvägslinje att elektrifieras i Sverige berodde på att staten 1907 gått in som hälftenägare i gruvbolaget LKAB och att nya avtal fastställde en ökad brytning och transport av järnmalm, från 1,5 miljoner ton årligen 1908 till 3,85 miljoner ton 1918. Denna mängd kunde inte transporteras inom befintligt system med ångdrift utan omfattande investeringar, vilket innebar att en systemomvandling till elektrisk drift ansågs vara ett bättre alternativ. I maj 1910 beslutade riksdagen anslå 21,5 miljoner kr till projektet som skulle drivas av Järnvägsstyrelsens byrå för elektrisk drift i samverkan med företagen Siemens och ASEA. Kontraktsskrivningen ställde hårda krav på företagen gällande prestanda och utförande och Järnvägsstyrelsen kunde när som helst, senast två år efter övertagandet av driften av banan, besluta att upphäva kontraktet och kräva att företagen återställde anläggningen till ursprungligt skick.Det var en mängd tekniska subsystem och komponenter som skulle färdigställas och sättas samman för att det tekniska primärsystemet ”den elektrifierade Riksgränsbanan” skulle fungera. Speciellt färdigställandet av loken och isolatorerna till ledningssystemet omgärdades av problem som kom att försena projektets färdigställande. Problemen var både organisatoriska och tekniska till sin natur men kunde efterhand åtgärdas genom att det utarbetades bättre rutiner vid korrespondens och annan kontakt mellan aktörerna samt genom att det togs större hänsyn till lokala klimatologiska förhållanden i samband med teknikutveckling. I sin roll som byrådirektör för byrån för elektrisk drift skulle Ivan Öfverholm visa sig vara en stark representant för beställaren och han spelade en central roll för projektets genomförande. Öfverholm kan i detta sammanhang kategoriseras som en offentlig systembyggare som med fast hand styrde projektet. Ibland innebar detta att Öfverholm hamnade i direkt konflikt med företagens representanter men ofta fungerade han också som medlare i de konflikter som ideligen uppstod mellan Byråns och företagens lokala representanter vid anläggningen. Den tvååriga garantitiden inleddes den 1 oktober 1915 och i slutet av 1917 hade nästan samtliga kvarstående arbeten vid anläggningen fullföljts och SJ kunde ta över anläggningen. Slutomdömet om Riksgränsbanans elektrifiering var överlag positivt och 1919 beslutade riksdagen att elektrifiera resterande del av Malmbanan, vilket var genomfört från Narvik till Luleå sommaren 1923. Det banbrytande arbetet i den norrländska ödemarken med att elektrifiera Sveriges nordligaste järnväg var därmed avslutat. / <p>Godkänd; 2012; 20120221 (roiwik); DISPUTATION Ämnesområde: Teknikhistoria/History of Technology Opponent: Dr Mats Fridlund, Institutionen för filosofi, lingvistik och vetenskapsteori, Göteborgs universitet Ordförande: Biträdande professor Kristina Söderholm, Institutionen för ekonomi, teknik och samhälle, Luleå tekniska universitet Tid: Fredag den 20 april 2012, kl 10.15 Plats: A1547, Luleå tekniska universitet</p>
74

Signalfel – Hur kan dessa reduceras? : Analys av driftstörningar i signalsystem på Ostkustbanan / Signalling failure – How can these be reduced? : Analysis of disruptions in the signalling at the East Coast Line

Hoang, Victoria, Ly, Kevin January 2015 (has links)
Under de senaste årtionden har tågförseningar i järnvägen ökat allt mer i samband med en minskande driftsäkerhet. Orsaken till den låga driftsäkerheten kan kopplas till den ökade trafikmängden och eftersatta underhållsarbeten, det vill säga slitna spår som används alldeles för länge. Detta ökar därmed störningskänsligheten för fel som ger upphov av stopp i trafiken, vanligtvis benämns det som ett ”signalfel”. Ett signalfel handlar om ett fel som kan uppstå i en mängd olika komponenter inom signalanläggningen. Dessa har delats in i sex olika delar bestående av signalställverket, spårledningar, baliser, tågledningssystem, plankorsningar samt själva signalerna. Ett fel i någon av dess komponenter ger till följd att signalerna går till ett säkert läge vilket innebär ett stopp i trafiken. De orsaker och komponenter som bidrar till en låg driftsäkerhet i järnvägen lyfts fram i detta arbete för att upplysa om de problem som återfinns i järnvägen. Fokus har legat på att ta fram åtgärdsförslag på den komponent som bedöms känsligast i signalanläggningen. Resultatet visade på att fel som sker i signalanläggningen till störst del genereras av spårledningar. Inom spårledningar så är det mest förekommande felet överledningar av isolerskarvar, vilket bedöms vara den känsligaste komponenten i signalanläggningen. Detta gäller speciellt i Stockholmsområdet, där tågtrafiken är som tätast och störningar påverkar ett stort antal resenärer. Åtgärderna som utförs för spårledningsfel är främst kortsiktiga lösningar såsom rensningar, kontroller eller ingen åtgärd alls. Oftast utförs lösningarna först efter att fel har uppstått, vilket innebär att ”signalfel” och dess konsekvenser redan har påverkat trafiken. För att höja driftsäkerheten krävs ett mer aktivt och effektivt underhållsarbete. Satsningar på innovativa lösningar och åtgärdsförslag bör utföras i syfte att minska frekvensen för störningar. / During the past decades, the railway train delays have increased greatly associated with a decreasing reliability. The cause of the low reliability can be connected to the increased amount of traffic and the lagging maintenance, that is to say worn track that remains too long. This thereby increases sensitivity to disturbance of the fault that causes stop in the traffic, usually termed it as a 'signal failure'. A signal failure is an error that can occur in a variety of components within the signalling system. These have been divided into six different parts consisting of signalling control, track circuits, beacons, train control systems, level crossings and signals themselves. An error in one of its components gives the result that the signals go to a safe state, which means a halt in traffic. The causes and components that contribute to a low reliability of the railways are highlighted in this work to raise awareness of the problems found in the railway. The focus has been on developing action proposals on the component that is deemed most sensitive in the signaling system. The results showed that errors occurring in the signaling system are mostly generated by the track circuits. The most common error in track circuits is the occurrence of conduction on the insulated joints, which is judged as the most sensitive component in the signalling system. This is especially true in the Stockholm area, which is where the train traffic is as most dense and where disturbances affect a large number of travelers. Actions performed on track circuit faults are mainly short-term solutions such as cleansing, checks and no actions at all. Solutions usually performs after error has occurred, which means that signalling failure and its consequences already has affected the traffic. In order to increase the reliability it requires a more active and effective maintenance work. Investments in innovative solutions and action proposals should be performed in order to reduce the frequency of disturbances.
75

Rockfalls from rock cuts beside Swedish railroads : A full scale fieldtest, to investigate rockfalls and how rock bounces

Thorbjörnson Lind, Thomas January 2016 (has links)
Rockfalls is a major problem around the world, if they occur in populated areas, they can cause major damage to infrastructure, injure or kill people. For this reason, it is important to be able to predict where the risk of rockfalls and how to prevent and protect populated areas from them. However, it is no easy task to predict rockfalls. Although if an area with potential area for rockfall is localized it may seem easy to construct protective meshing or bolting potential blocks down. But in many cases this is not easy to do due to practical issues or economic reasons, for example in rock cuts on older railways in Sweden. Fall heights from rock cuts like that are not particularly high but the risk of damage to the trains and infrastructure in the track area is high, however, it is unknown how extensive the damage may be. Trafikverket, the Swedish authority responsible for Sweden's roads and railways, has for some years investigated a new method for classifying and minimize the risk of rockfalls from rock cuts next to the railways. This study include aims to include the potential maximum distance of a block from the rockfall can travel to the existing method. This master's work is part of the investigation and will include full scale field test where the rockfalls are examined by filming them and then evaluate the “bounce coefficient”, coefficient of restitution, from the individual rockfalls using photogrammetric methods. During the field study, a geotechnical testing equipment, DCP test rig, to be evaluated for its ability of an easy way in the field to produce an estimated value on the coefficient of restitution. During the evaluation, two rockfall simulating software be used to investigate how well the results from them match the true blocks movements. / Stenras är ett stort problem runtom i världen, om de inträffar i bebyggda områden kan de leda till stora skador på infrastruktur, skador eller dödsfall. Av den anledningen är det viktigt att kunna förutse vart det finns risk för stenras och hur man kan förebygga dem och skydda bebyggda områden från dem. Dock är det ingen lätt uppgift att förutse stenras. Även om det finns ett potentiellt område för stenras kan det tyckas lätt att placera ut skyddsnät eller bulta fast potentiella block. Men i många fall är detta inte praktiskt, eller ekonomiskt, till exempel i bergsskärningar på äldre järnvägar i Sverige. Fallhöjderna här är inte speciellt höga men risken för skador på tåg och infrastruktur i spårområdet är hög, dock är det okänt hur omfattande skadorna kan bli. Trafikverket, den svenska myndigheten som ansvarar för Sveriges vägar och järnvägar, har under flera år utrett en ny metod för att klassificera och minimera riskerna för stenras från bergskärningar bredvid järnvägar. Denna utredning syftar bland annat till att till att väga in det potentiella maximalt avstånd ett block från stenras kan färdas i den befintliga modellen. Det här mastersarbetet är en del i den utredningen och kommer att innefatta ett fullskaligt fältförsök där stenras undersöks genom att de filmas och sedan utvärderas studskoefficienten, coefficient of restitution, från de enskilda rasen i stereo. Under fältstudien kommer en geoteknisk testutrustning, DCP test rigg, att utvärderas för sin förmåga att lätt i fält få fram ett uppskattat värde på studskoefficienten. Under utvärderingen kommer två stenrassimuleringsprogram att användas för att undersöka hur väl de stämmer med de verkliga blockens rörelser.
76

Ballast eller ballastfritt, det är frågan : Modellförslag för icke–monetär nyttovärdering av två olika järnvägskonstruktioner

Persson, Madeleine January 2020 (has links)
To cut transport carbon dioxide emissions by 70% by the year of 2030, the Swedish government is investing in new railway infrastructure, hoping to stem the emissions caused by the transport sector. It is planned to stretch between Stockholm–Malmö and Stockholm–Gothenburg. The first section Ostlänken, is located between Järna in Södertälje municipality (Stockholm) and Linköping. It will be a 160 kilometers long railway with double track in ballast. All railways in Sweden are built with ballast, but internationally, ballast–free methods, so called slab tracks, are increasing in popularity. This master thesis aims to compare ballast tracks with a general model of slab tracks, in regard to carbon dioxide emissions. The study also aims to evaluate how several criteria can be compared to each other as non-monetary, in an evaluation model. Three criterions will be considered: availability, economic costs and carbon dioxide emissions. A case study of Ostlänken was used as a methodological framework. Further, a literature review has been implemented as well as several interviews. Calculations of carbon dioxide emissions from the two tracks respectively were performed through a life cycle analysis (LCA). Through a multicriteria analyse, the three criteria were evaluated in respect of each other. All calculations were performed in Excel. The result that could be drawn from the study, was that from a carbon dioxide point of view, ballast tracks have a much greater need for maintenance to preserve the track geometry. Slab track on the other hand, generate higher emissions in the start of the life cycle, due to its large amount of concrete and steel. Multicriteria analysis were shown to be a helpful tool when making decisions in complex systems. The multicriteria analysis could benefit from including other case specific factors as well. This might however also lead to a far too complex model, from which fewer conclusions can be drawn.
77

Implementering av PV-system på Trafikverkets teknikhus / Implementation of PV-systems at the Swedish Transport Administration’s signal boxes

Eriksson, Jimmy, Klasson, Niklas January 2021 (has links)
Solcellstekniken har funnits sedan lång tid tillbaka och har med en kontinuerlig utveckling vuxit fram till att bli ett rimligt alternativ för kraftförsörjning. Fördelen med solpaneler är dess installationsmöjligheter vilket tillåter installation på outnyttjade ytor så som fasader och tak. Västlänken är ett stort pågående projekt i Göteborg, projektet innefattar byggnation av nya tågstationer och förläggning av ny järnväg. Detta innebär upprättning av nya teknikhus i anslutning till järnvägen. I samband med detta väcker Sweco Sverige frågan om hur takytorna bäst kan användas på dessa teknikhus. Syftet med arbetet är att tillsammans med Sweco undersöka vilken effekt som kan genereras av en solcellsanläggning som installeras på teknikhus som är belägna i Göteborg, huruvida installation av ett PV-system är möjlig med den befintliga utrustningen som finns i ett teknikhus och hur stor del av utrustningen i ett teknikhus som kan drivas av den genererade effekten från PV-systemet. För beräknandet av potentiell uteffekt från PV-system användes ett simuleringsprogram framtaget av Energiforsk AB. Gällande installationsmöjligheter fördes direktkontakt med företaget som levererar rectiverters till Trafikverket. Resultatet visar att effekten från ett PV-system är direkt beroende av installationsytan samt verkningsgraden på solcellsmodulerna där uteffekten varierar från 0,10 kW vid lägst verkningsgrad och minst installationsyta till 1,62 kW vid högst verkningsgrad och störst installationsyta. Installation av ett PV-system är ej genomförbar till den befintliga utrustningen i teknikhusen utan måste kompletteras med tilläggsmoduler och solladdare för att systemet ska fungera på ett tillfredställande sätt. Med resultatet kunde lasteffekten för den avbrottsfria kraften och uteffekten från PV-systemet jämföras för Scenario 1 och Scenario 2, då det var för dessa två scenarier som lasteffekten var känd. Andelen av lasteffekten för den avbrottsfria kraften som kan tillgodoses av ett PV-system beräknades till 1,6 % ̶ 10,1 % för Scenario 1 och 2,3 % ̶ 18,2 % för Scenario 2. / Solar cell technology has been around for a long time and has with continuous development grown to become a viable alternative for power supply. The advantage of solar panels comes with the possibilities for installations on surfaces such as facades and roofs. Västlänken is a large ongoing project in Gothenburg, the project includes the construction of new train stations and the construction of a new railway. This includes the establishment of new signal boxes along the railway. In conjunction with this, Sweco Sweden has raised the question of how to best utilize the roof of these signal boxes. The purpose of this thesis is, in cooperation with Sweco Sweden, to investigate the potential output power that can be generated by a photovoltaic system once installed on the signal boxes located in Gothenburg, whether installation of a PV system is possible with the existing equipment in a signal box and how much of the equipment in the signal box that can be powered by the PV-system. For the calculation of potential output power from PV-systems, a simulation program designed by Energiforsk AB was used. Regarding the installation options a direct contact with the company that supplies rectiverters to the Swedish Transport Administration was established. The results shows that the output power of PV-systems depends on the installation area and the efficiency of the photovoltaic modules. The output power varies from 0.10 kW at the lowest efficiency and the smallest installation area to 1,62 kW at the highest efficiency and largest installation area. Installation of a PV-system is not feasible with the existing equipment in the signal boxes as additional modules and solar chargers are needed for a working system. With the result, the load for the uninterruptible power and the output power from the PV system could be compared for Scenario 1 and Scenario 2, as the load was known for just these two. The part of the load that can be met by the PV-system was calculated to be 1,6 % ̶ 10,1 % for Scenario 1 and 2,3 % ̶ 18,2 % for Scenario 2
78

Intermodala godstransporter : Varför väljer inte fler företag intermodala järnvägstransporter? / Intermodal freight transport : Why don't more companies choose intermodal rail transport?

Albrup, Jon, Ahmic, Amar January 2023 (has links)
Syftet med arbetet är att undersöka vad det är som hindrar företag i dagsläget från att använda intermodala godstransporter med järnvägen, där frågeställningar som arbetet kommer att besvara är: Överväger fördelarna de nackdelar som finns med användningen av intermodala godstransporter på järnvägen? Samt hur ser framtiden ut för intermodala godstransporter på järnväg? För att besvara syftet har vi använt oss av kvalitativa metoder i form av intervjuer, där intervjufrågorna utformades utifrån semistrukturerade intervjuer. Det teoretiska ramverket är uppbyggt med hjälp av vetenskapliga artiklar och indelat i fyra aspekter som anses vara viktiga för kunder och deras val av transportslag vid transport av gods. Det empiriska materialet är utformat efter intervjuer med intervjupersoner som arbetar med intermodala godstransporter och där dessa arbetar på olika företag. Det empiriska materialet har sedan ställts mot det teoretiska ramverket för att ta fram en analys, där materialet analyserades genom en tematisk analysmetod. Arbetet kom fram till resultatet att hållbarhet alltid varit en av järnvägens starkaste fördelar, men järnvägens nackdelar är de som påverkar kundernas val mest. Nackdelarna är tid och leveranssäkerhet, för att motverka dessa nackdelar krävs det att man gör investeringar i järnvägsinfrastrukturen. Dessa investeringar kan vara att bygga ut eller förbättra den nuvarande järnvägsinfrastrukturen i hopp om att få fler spår och ett starkare nätverk kommer att minimera nackdelarna så att transporterna kan utföras snabbare och effektivare. Framtiden för järnvägen är lovande om investeringar och projekt planeras rätt. Förbättringar kommer leda till att godstransporter på järnväg ökar, dock överväger fördelarna i dagsläget inte nackdelarna om man är ett företag som har tidskänsliga transporter. / The purpose of this work is to investigate what prevents companies from currently using intermodal rail transportation, where the research questions to be answered are: Do the benefits outweigh the disadvantages of using intermodal rail transportation? What does the future hold for intermodal freight transportation by rail? To address the purpose, we have utilized qualitative methods in the form of interviews, where the interview questions were designed based on semi-structured interviews. The theoretical framework is built using scientific articles and divided into four aspects considered important for customers and their choice of transport mode for the transportation of goods. The empirical material is based on interviews with interviewees working with intermodal rail freight, representing different companies. The empirical material was then compared to the theoretical framework to conduct an analysis, where the material was analyzed using thematic analysis method. The study concluded that sustainability has always been one of the strongest advantages of rail transportation, but it is the disadvantages of rail transportation that have the greatest impact on customers' choices. The disadvantages include time and delivery reliability, and to counteract these disadvantages, investments in rail infrastructure are required. These investments can involve expanding or improving the current rail infrastructure, with the hope that more tracks and a stronger network will minimize the disadvantages, allowing for faster and more efficient transportation. The future of rail transportation is promising if investments and projects are planned correctly. Improvements will lead to an increase in rail freight, but currently, if a company has time-sensitive shipments, the disadvantages outweigh the benefits.
79

Analys av en spännarmerad balkbro : Inverkan på spännvidd och armeringsåtgång

Wennerkull, Hampus, Svensson, Robin January 2020 (has links)
Concrete girder bridges are a commonly used type of bridge which can be reinforced withboth regular and post-tensioned reinforcement. At a certain span length, the use of tensionreinforcement becomes a must because regular reinforcement won’t be enough. To get anidea of where this boundary lies, we studied a bridge in this research which is a half-throughbridge intended for railway traffic with the use of post-tensioned reinforcements. Thisbridge has a span of 22,15 metres and it is compared to bridges at the same span andshorter span using regular reinforcements. The analysis in this thesis is made using the finiteelementsprogram Brigade Standard.Two previously executed projects are used as references. A literature study will be carriedout initially, where Eurocodes, old examination projects and other literature on tensionreinforcement are examined.The acquired result is that the tension-reinforced bridge relates to a bridge with about 3/4span with regards to torque over the middle support. The torque over the support is thelimiting factor which causes an exponential increase in the amount of reinforcement atlonger spans. At about 20 metres the amount of necessary reinforcement starts to increaseexponentially and above this span post-tensioning is the preferred method.Torsion at the end support is also a crucial parameter since a regular-reinforced bridge with20-metre span cannot be reinforced to handle this with the current geometry. At a 20-metrespan, actions are therefore required to improve the torsion capacity, for example, increasingthe girder width. This increased girder width could be considered a saving in materials dueto the avoided increment of concrete in the case of tension-reinforced design, where thisincreased width is unnecessary.The total amount of reinforcement, independent of the reinforcement type, is greater in themiddle support of the regular reinforced bridge than the tension reinforced with the samespan. However, the total amount of reinforcement over the entire bridge is higher in thetension reinforced alternative.The result also shows that the tension reinforcement increases the compression force in thebridge and eliminates tension cracks which were expected according to our literature study.
80

Effektivisering av teknikhusens grundläggningar längs järnvägar : Ett arbete som behandlar behovet om att effektivisera standarden för grundläggningen av ett teknikhus. / Making the foundation of equipment shelters along the railway more efficient : A project that addresses the need to improve the standard for the foundation of an equipment shelter.

Yildirim, Siho, Rashid, Omar January 2017 (has links)
Trafikverket har ansvaret för ett av Sveriges största infrastrukturprojekt, nämligen att ersätta det nuvarande signalsystemet längs landets järnvägar till ERTMS. Med bytet av signalsystemet kommer behovet av att byta ut 1 500 teknikhus. Syftet med arbetet är att genom en analys av kostnader för den nuvarande grundläggningsstandarden med U-betongplintar för teknikhus, försöka hitta billigare lösningar. Arbetet utförs främst genom en analys av alternativa material- och grundläggningstyper, men hänsyn tas även till tillverkning, installation, logistik, påverkande laster och geologi. Delmålet är att kunna sänka den nuvarande kostnaden för projektet och huvudmålet är att hitta en ny framtida standard för grundläggningen av Trafikverkets teknikhus. De vanligaste grundläggningstyperna för teknikhusen visade sig vara kryp- och plintgrunder, utav plåt respektive betong. I arbetet presenteras även markskruvar, som är en ny idé för teknikhusen. Slutsatsen av rapporten är att markskruvar är det billigaste och smidigaste grundläggningsvalet för teknikhus. Även plåtramar, som idag är ett mer vanligt förekommande alternativ för teknikhus, är billigare än den nuvarande standarden. Arbetets totala besparing för projektet är nära 34 miljoner kronor med markskruvar, och därför har delmålet uppnåtts. Huvudmålet om att hitta en ny standard kräver däremot framtida undersökningar av Trafikverket innan fastställning. En rekommendation för Trafikverket är att vidareundersöka priset för utländska leverantörers markskruvar och avgöra om installationen ska utföras på egen hand. För vidare studier rekommenderas en noggrann analys på transportkostnader för grundläggningar och hur stora kostnader de fribärande teknikhusen tillför. / Trafikverket is responsible for one of Sweden’s largest infrastructure project, namely replacing the current signal system along the countries railway to ERTMS. With the replacement of the signal system comes the need to replace 1 500 equipment shelters. The task is to analyze costs for the equipment shelter’s current foundation standard and try to find cheaper solutions. The work is mainly executed by analyzing alternative materials and foundations, but also manufacturing, installation, logistics, impacting loads and geology. One of the goals is to reduce the current costs of the project, and the main task is to find a new foundation standard that Trafikverket can use for future equipment shelters. The most common foundation types for equipment shelters turned out to be crawling spaces and plinth foundations out of sheet-metal and concrete. The report also presents ground screws, which is a new idea for equipment shelters. The report’s conclusion is that ground screws are the cheapest and most flexible foundation for equipment shelters. Even sheet-metal frames, which are a more common option today, proved to be a more economical choice than the current standard. The total saving turned out to be near 34 million SEK with ground screws and therefore one of the objectives has been achieved. The main goal of possibly finding a new standard, however, requires future investigations by Trafikverket before it can be determined possible. A recommendation to Trafikverket is to further investigate the price of foreign suppliers’ ground screws and determine if the installation is to be carried out on its own. For further studies, a detailed cost analysis of cantilevered houses and transports is recommended.

Page generated in 0.037 seconds